My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 7 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00010130Takeoff Qty: <br />Bid Qty:1.000 LS <br />LSUnit:1.00Quantity:Attorney/Legal Fees023-20Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />*** Costs for attorney and legal services. ***Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,000.00500.00100.00500.00HR20.001.00Attorney/Legal Fees92202 <br />LS1.00011000Takeoff Qty: <br />Bid Qty: <br />SITE CIVILBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />284,886.3812,300.000.00127,538.002,669.1035,398.3026,533.3880,447.6029,342.5051,105.10Total <br />284,886.3812,300.000.00127,538.002,669.1035,398.3026,533.3880,447.6029,342.5051,105.10U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0043104.795966.5726371.1101767.66000.0013767.6600 <br />SFUnit:22400.00Quantity:Remove ACP113-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />13,881.730.000.000.000.000.006,539.507,342.232,600.474,741.76Total <br />0.620.000.000.000.000.000.290.330.120.21U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,718.32390.00026,000.00543.7333371.8324600.00050.00170.6197 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.211798.34220.0033300.026874.6600 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:37.33Crew Hrs:100.00Eff:600UHProd:Excav X330/2 MenE332Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,539.50175.18109.75161.48HR37.331.00JD 330 Excavator 33MT8EX330 <br />3,152.6784.45110.0049.38MH37.331.00Laborer - Grade Checker G4LGC <br />4,189.56112.23110.0066.10MH37.331.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />TCYUnit:410.00Quantity:Haul Demo ACP -> Waste113-40Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />19,706.7512,300.000.000.002,669.100.000.004,737.651,666.393,071.26Total <br />48.0730.000.000.006.510.000.0011.564.067.49U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,806.52440.0100100.00004.1000115.552410.00000.100011.5552 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />7.4909115.55240.100010.000041.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:1.00Labor Pcs:41.00Crew Hrs:100.00Eff:10UHProd:*** CREW ON FLY ***ZZCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,669.106.51108.506.00TCY410.001.00Dump Fee ACP/TCY3DFACP <br />12,300.00200.00100.00200.00HR61.501.00Truck & Trailer - OPER5HHDTP <br />4,737.65115.55110.0068.10MH41.001.00Operator ForemanOF
The URL can be used to link to this page
Your browser does not support the video tag.