Laserfiche WebLink
Page 8 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TONUnit:510.00Quantity:CSTC - Purch FOB Job326-15Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />11,898.3023.33100.0023.33TON510.001.00LAKESIDE - Cr Surf Top Course <br />FOB Job2AJCSTC <br />TONUnit:510.00Quantity:CSTC - Place326-25Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,243.140.000.000.000.000.004,071.1911,171.953,938.137,233.82Total <br />29.890.000.000.000.000.007.9821.917.7214.18U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,977.70200.0050200.00002.5500597.770220.00000.050029.8885 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />14.1840109.52890.20005.0000102.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />4.00Equipment Pcs:4.00Labor Pcs:25.50Crew Hrs:100.00Eff:20UHProd:(Mod) Finish 140G/GPS/RL/WT/4 MenFB4GCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />643.8025.25109.7523.27HR25.501.0047" Dbl Drum Roller 3 MT OSR8CMDD4 <br />1,376.3553.97109.7549.58HR25.501.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />811.4831.82109.7530.68HR25.501.00Ford F450 Flatbed8TKJ450 <br />1,239.5648.61109.7545.18HR25.501.00Water Truck 4000 Gal8WAT4 <br />5,631.50110.42110.0065.01MH51.002.00Oper Dzr->D9/Ex->15MT G3O3 <br />2,946.59115.55110.0068.10MH25.501.00Operator ForemanOF <br />2,593.86101.72110.0059.77MH25.501.00Operator TeamsterOT <br />CYUnit:400.00Quantity:Topsoil and Seed328-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />47,927.150.000.002,500.000.0020,000.008,355.9917,071.166,295.1310,776.03Total <br />119.820.000.006.250.0050.0020.8942.6815.7426.94U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />11,981.78750.0100100.00004.0000635.678810.00000.100063.5679 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />26.9401106.69480.40002.5000160.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />4.00Equipment Pcs:4.00Labor Pcs:40.00Crew Hrs:100.00Eff:10UHProd:(Mod) Embank 140G/RL/WT/4 MenEMB4Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />20,000.0050.00100.0050.00CY400.001.00Topsoil2TOPSOIL <br />2,500.002,500.00100.002,500.00MIN1.001.00Hydroseed4HYDROSEED <br />1,009.8925.25109.7523.27HR40.001.0047" Dbl Drum Roller 3 MT OSR8CMDD4 <br />2,158.9753.97109.7549.58HR40.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />3,914.2297.86109.7590.74HR40.001.00JD 644 Loader 4.5 CY8LD644 <br />1,272.9131.82109.7530.68HR40.001.00Ford F450 Flatbed8TKJ450 <br />3,480.4087.01110.0049.38MH40.001.00Laborer - Grade Checker G4LGC <br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />9,038.21112.98110.0065.01MH80.002.00Oper Dzr->D9/Ex->15MT G3O3 <br />TNUnit:747.00Quantity:Asphalt Paving329-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />115,038.00154.00100.00154.00TN747.001.00NORTHSHORE - ACP Paving Sub4ACP