Laserfiche WebLink
Page 100 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0111105.148966.3264205.1991390.00000.0026390.0000 <br />EAUnit:1.00Quantity:Remove Roof190-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />27,455.040.000.000.000.000.0012,852.0614,602.985,428.429,174.56Total <br />27,455.040.000.000.000.000.0012,852.0614,602.985,428.429,174.56U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />9,151.68003.00000.33333.0000915.16800.033330.000027,455.0400 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />9,174.560097.3532150.00000.0067150.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:5.00Labor Pcs:30.00Crew Hrs:100.00Eff:30HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Remove only one sideNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />11,653.59388.45109.75358.34HR30.001.00Grove RT880E 80 Ton8CRRG8 <br />1,198.4739.95109.7536.40HR30.001.00Scissor Lift 20' Elec OSR8MLS20 <br />6,180.92103.02110.0059.01MH60.002.00Carpenter JourneymanCJ <br />4,969.8382.83110.0046.86MH60.002.00Laborer - General G3/4LG <br />3,452.23115.07110.0066.27MH30.001.00Oper Crane <100T G1OC1 <br />DAYSUnit:6.00Quantity:Demolish Existing Tanks,Mechanical and <br />Electrical190-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />52,572.61300.000.000.00651.000.0025,216.5326,405.089,712.3416,692.74Total <br />8,762.1050.000.000.00108.500.004,202.764,400.851,618.722,782.12U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />8,762.10171.00001.00006.0000860.36020.100010.00008,603.6017 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,782.1233110.021240.00000.0250240.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:4.00Labor Pcs:60.00Crew Hrs:100.00Eff:10HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />2 tanks x 1 days per tank = 2 days - Lift out with crane <br />Chem piping and pumps = 2 days <br />Electrical & Misc Cleanup = 2 days <br />2 Loads to the dump 3 hour rounds 6 hrs <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />651.00162.75108.50150.00TN4.001.00Trash Dump Fee3DFTRSH <br />300.00150.00100.00150.00HR2.001.00Demo Bomber Truck - OPER5HHDD <br />23,307.17388.45109.75358.34HR60.001.00Grove RT880E 80 Ton8CRRG8 <br />1,909.3631.82109.7530.68HR60.001.00Ford F450 Pipefitter8TKJ450P <br />4,969.8382.83110.0046.86MH60.001.00Laborer - General G3/4LG <br />6,904.46115.07110.0066.27MH60.001.00Oper Crane <100T G1OC1 <br />14,530.79121.09110.0069.89MH120.002.00Pipefitter JourneymanPFJ <br />LS1.00022020Takeoff Qty: <br />Bid Qty: <br />BUILDING IMPROVEMENTSBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor