|
Page 99 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />9,712.350.000.000.000.001,000.00555.538,156.823,019.645,137.18Total
<br />9,712.350.000.000.000.001,000.00555.538,156.823,019.645,137.18U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,856.17502.00000.50002.0000435.61750.050020.00008,712.3500
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />5,137.1800101.960380.00000.012580.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:4.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew:
<br />allowance to cover touchup paintNotes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,000.001.00100.001.00DOL1,000.001.00Perm Matl Allowance2CMA
<br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08
<br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG
<br />4,843.60121.09110.0069.89MH40.002.00Pipefitter JourneymanPFJ
<br />LFUnit:480.00Quantity:Remove 63" bypass720-35Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />9,629.590.000.000.000.000.001,635.027,994.572,964.845,029.73Total
<br />20.060.000.000.000.000.003.4116.666.1810.48U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,814.79500.0042240.00002.0000481.479524.00000.041720.0616
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />10.478699.93210.16676.000080.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />2.00Equipment Pcs:4.00Labor Pcs:20.00Crew Hrs:100.00Eff:0.0417HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,079.4953.97109.7549.58HR20.001.00Takeuchi 135 Excvatr 3.5MT8EX135T
<br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08
<br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG
<br />2,259.55112.98110.0065.01MH20.001.00Oper Dzr->D9/Ex->15MT G3O3
<br />2,421.80121.09110.0069.89MH20.001.00Pipefitter JourneymanPFJ
<br />LS1.00022000Takeoff Qty:
<br />Bid Qty:
<br />FLOURIDE SYSTEM IMPROVEMENTSBiditem - Parent
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />579,096.89300.000.00244,286.326,076.00151,196.5457,568.88119,669.1543,978.1275,691.03Total
<br />579,096.89300.000.00244,286.326,076.00151,196.5457,568.88119,669.1543,978.1275,691.03U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0000111.216770.3448538.19411,076.00000.00091,076.0000
<br />LS1.00022010Takeoff Qty:
<br />Bid Qty:
<br />REMOVE ROOF & MISC DEMOBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />80,027.65300.000.000.00651.000.0038,068.5941,008.0615,140.7625,867.30Total
<br />80,027.65300.000.000.00651.000.0038,068.5941,008.0615,140.7625,867.30U. Cost
|