My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 102 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />71,196.5471,196.54100.0071,196.54LS1.001.00KDB - Fluoride Pipe Materials2FLUORIDEPIP <br />1,500.001,500.00100.001,500.00LS1.001.00Structural Pipe Supports2PIPESUPPORT <br />DAYSUnit:2.00Quantity:Chemical Transfer Systems710-15Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />7,968.290.000.000.000.000.00636.457,331.842,674.834,657.01Total <br />3,984.150.000.000.000.000.00318.233,665.921,337.422,328.51U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,984.14501.00001.00002.0000398.41450.100010.00003,984.1450 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,328.5050122.197330.00000.033360.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:10HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />636.4531.82109.7530.68HR20.001.00Ford F450 Pipefitter8TKJ450P <br />2,488.24124.41110.0071.89MH20.001.00Pipefitter ForemanPFF <br />4,843.60121.09110.0069.89MH40.002.00Pipefitter JourneymanPFJ <br />DAYSUnit:10.00Quantity:Fluoride Piping710-25Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />31,395.160.000.000.000.000.007,177.1724,217.998,841.3115,376.68Total <br />3,139.520.000.000.000.000.00717.722,421.80884.131,537.67U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,139.51601.00001.000010.0000313.95160.100010.00003,139.5160 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,537.6680121.090020.00000.0500200.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:2.00Labor Pcs:100.00Crew Hrs:100.00Eff:10HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,994.9039.95109.7536.40HR100.001.00Scissor Lift 20' Elec OSR8MLS20 <br />3,182.2731.82109.7530.68HR100.001.00Ford F450 Pipefitter8TKJ450P <br />24,217.99121.09110.0069.89MH200.002.00Pipefitter JourneymanPFJ <br />DYSUnit:1.00Quantity:Cleaning & Testing710-50Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,192.020.000.000.000.000.00254.581,937.44707.311,230.13Total <br />2,192.020.000.000.000.000.00254.581,937.44707.311,230.13U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,740.02500.80001.25000.8000274.00250.12508.00002,192.0200 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,230.1300121.090016.00000.062516.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:8.00Crew Hrs:100.00Eff:8HUProd:Mechanical Crew - 2 MenMC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />254.5831.82109.7530.68HR8.001.00Ford F450 Pipefitter8TKJ450P <br />1,937.44121.09110.0069.89MH16.002.00Pipefitter JourneymanPFJ <br />EAUnit:1.00Quantity:Purchase Tanks795-00Activity:
The URL can be used to link to this page
Your browser does not support the video tag.