Laserfiche WebLink
Page 105 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.1000121.090076.8835162.001520.00000.050020.0000 <br />MHUnit:18.00Quantity:Pipe Labeling710-01Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,240.030.000.000.000.00500.00318.232,421.80884.131,537.67Total <br />180.000.000.000.000.0027.7817.68134.5449.1285.43U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,240.03000.055618.00001.0000274.00301.80000.5556152.2239 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />85.4261121.09001.11110.900020.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:0.5556HUProd:Mechanical Crew - 2 MenMC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />500.00500.00100.00500.00LS1.001.00Pipe Labeling Materials2-PIPELABEL <br />318.2331.82109.7530.68HR10.001.00Ford F450 Pipefitter8TKJ450P <br />2,421.80121.09110.0069.89MH20.002.00Pipefitter JourneymanPFJ <br />LS1.00023000Takeoff Qty: <br />Bid Qty: <br />EXISTING ALUM POLYMER BUILDING CHEM DEMOBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />135,957.530.000.0053,025.0012,531.755,250.0011,597.9753,552.8119,893.8733,658.94Total <br />135,957.530.000.0053,025.0012,531.755,250.0011,597.9753,552.8119,893.8733,658.94U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.008398.082161.6464249.0065546.00000.0018546.0000 <br />LSUnit:1.00Quantity:Demolish Tanks and Piping660-80Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />62,017.250.000.000.0012,531.750.009,331.0540,154.4514,951.7125,202.74Total <br />62,017.250.000.000.0012,531.750.009,331.0540,154.4514,951.7125,202.74U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,752.15638.00000.12508.0000618.56880.012580.000049,485.5000 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />25,202.740095.6058420.00000.0024420.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.05Equipment Pcs:5.25Labor Pcs:80.00Crew Hrs:100.00Eff:80HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />CMA is for demo blades / equNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,696.251.09108.501.00DOL5,250.001.05Consumable Matl Allowance3CMA <br />6,835.501,627.50108.501,500.00EA4.201.05FRP Tank Dump Fees3DFFRP <br />9,331.05111.08109.75101.72HR84.001.0560' Manlift OSR8ML060 <br />8,932.34106.34110.0061.01MH84.001.05Carpenter ForemanCF <br />17,306.59103.02110.0059.01MH168.002.10Carpenter JourneymanCJ <br />13,915.5282.83110.0046.86MH168.002.10Laborer - General G3/4LG <br />LSUnit:1.00Quantity:Building Access660-82Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor