Laserfiche WebLink
Page 104 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5,441.190096.287090.00000.011190.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:3.00Labor Pcs:30.00Crew Hrs:100.00Eff:30HUProd:(Mod) Carpenter Crew - 2 ManC2Crew: <br />20 Hours to Install <br />10 Hours to RemoveNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,425.005,425.00108.505,000.00EA1.001.00*** LUMBER MATERIAL3LUL <br />6,180.92103.02110.0059.01MH60.002.00Carpenter JourneymanCJ <br />2,484.9182.83110.0046.86MH30.001.00Laborer - General G3/4LG <br />LS1.00022060Takeoff Qty: <br />Bid Qty: <br />REINSTALL ROOFBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />43,103.370.000.0024,800.000.000.008,568.049,735.333,618.966,116.37Total <br />43,103.370.000.0024,800.000.000.008,568.049,735.333,618.966,116.37U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.050097.353361.1637431.0337100.00000.0100100.0000 <br />EAUnit:1.00Quantity:ReInst Roof190-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />18,303.370.000.000.000.000.008,568.049,735.333,618.966,116.37Total <br />18,303.370.000.000.000.000.008,568.049,735.333,618.966,116.37U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />9,151.68502.00000.50002.0000915.16850.050020.000018,303.3700 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />6,116.370097.3533100.00000.0100100.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:5.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />7,769.06388.45109.75358.34HR20.001.00Grove RT880E 80 Ton8CRRG8 <br />798.9839.95109.7536.40HR20.001.00Scissor Lift 20' Elec OSR8MLS20 <br />4,120.62103.02110.0059.01MH40.002.00Carpenter JourneymanCJ <br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG <br />2,301.49115.07110.0066.27MH20.001.00Oper Crane <100T G1OC1 <br />SFUnit:1240.00Quantity:Roofing Sub930-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />24,800.0020.00100.0020.00SF1,240.001.00Roofing Sub4ROOF <br />LS1.00022070Takeoff Qty: <br />Bid Qty: <br />PIPE LABELINGBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,240.030.000.000.000.00500.00318.232,421.80884.131,537.67Total <br />3,240.030.000.000.000.00500.00318.232,421.80884.131,537.67U. Cost