Laserfiche WebLink
Page 107 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />CONTINGENCY/ALLOWANCE TOTAL <br />Subtotal <br />TotalMisc 3TruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,659,865.770.000.001,464,851.6710,000.000.00153,500.0015,064.1816,449.926,077.0310,372.89Total <br />LS1.00031030Takeoff Qty: <br />Bid Qty: <br />72" PUD VALVEBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />195,014.100.000.0010,000.000.00153,500.0015,064.1816,449.926,077.0310,372.89Total <br />195,014.100.000.0010,000.000.00153,500.0015,064.1816,449.926,077.0310,372.89U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0200104.443965.85961,238.1848157.50000.0063157.5000 <br />EAUnit:2.00Quantity:PI - Cut and Weld660-04Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />32,890.100.000.0010,000.000.001,666.6711,653.599,569.843,529.976,039.87Total <br />16,445.050.000.005,000.000.00833.345,826.804,784.921,764.993,019.94U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />10,963.36671.50000.66673.0000707.44770.066715.000010,611.7150 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,019.9350106.331645.00000.022290.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:30.00Crew Hrs:100.00Eff:15HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Transfered 2 ea. to Allowance bid itemNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,666.671.00100.001.00DOL1,666.671.00Perm Matl Allowance2CMA <br />10,000.005,000.00100.005,000.00EA2.001.00SUB - Pipe Welding4WELD <br />11,653.59388.45109.75358.34HR30.001.00Grove RT880E 80 Ton8CRRG8 <br />2,484.9182.83110.0046.86MH30.001.00Laborer - General G3/4LG <br />3,452.23115.07110.0066.27MH30.001.00Oper Crane <100T G1OC1 <br />3,632.70121.09110.0069.89MH30.001.00Pipefitter JourneymanPFJ <br />EAUnit:2.00Quantity:PI - Coating and Lining660-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,097.440.000.000.000.001,833.33497.192,766.921,033.781,733.14Total <br />2,548.720.000.000.000.00916.67248.601,383.46516.89866.57U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,097.44000.50002.00001.0000326.41100.20005.00001,632.0550 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />866.570092.230715.00000.066730.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:5HUProd:(Mod) Pipe Test AC185/2 MenPCT2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />833.331.00100.001.00DOL833.331.00Perm Matl Allowance2CMA <br />1,000.00500.00100.00500.00EA2.001.00Epoxy Paint2PNT <br />497.1949.72109.7545.99HR10.001.00185 CFM Compressor8AC185 <br />828.3082.83110.0046.86MH10.001.00Laborer - General G3/4LG