Laserfiche WebLink
Page 108 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1,210.90121.09110.0069.89MH10.001.00Pipefitter JourneymanPFJ <br />727.7272.77110.0040.80MH10.001.00Painter JourneymanPNJ <br />EAUnit:1.00Quantity:PI - Install Valves and DMJ's660-07Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />7,026.560.000.000.000.000.002,913.404,113.161,513.282,599.88Total <br />7,026.560.000.000.000.000.002,913.404,113.161,513.282,599.88U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,026.56001.00001.00001.0000702.65600.100010.00007,026.5600 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,599.8800109.684337.50000.026737.5000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.75Equipment Pcs:3.75Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Transfered 1 ea. to Allowance bid itemNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,913.40388.45109.75358.34HR7.500.75Grove RT880E 80 Ton8CRRG8 <br />828.3082.83110.0046.86MH10.001.00Laborer - General G3/4LG <br />863.06115.07110.0066.27MH7.500.75Oper Crane <100T G1OC1 <br />2,421.80121.09110.0069.89MH20.002.00Pipefitter JourneymanPFJ <br />EAUnit:1.00Quantity:Large Diameter Valve Purchase655-50Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />150,000.00150,000.00100.00150,000.00LS1.001.00FERGUSON - Pipe - Valve <br />Purchase2PIVALVES <br />LS1.00031050Takeoff Qty: <br />Bid Qty: <br />OWNER ALLOWANCESBiditem <br />1.000 LS <br />ESTUnit:1.00Quantity:Owners Allowance021-70Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />556,276.67556,276.67100.00556,276.67EST1.001.00Owners Allowance9OWNRALLOW <br />LS1.00032000Takeoff Qty: <br />Bid Qty: <br />PHASE 2 DB FEE 8%Biditem <br />1.000 LS <br />LSUnit:1.00Quantity:Design Build Fee026-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,616,193.711,616,193.71100.001,616,193.71LS1.001.00Design Build Fee9FEE <br />TOTAL COST INC DB FEE <br />Subtotal <br />TotalMisc 3TruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />21,818,615.050.00160,531.253,271,866.385,998,441.21592,707.706,430,103.932,068,572.383,296,392.201,188,484.642,107,907.56Total