My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
22013 W Bostian Rd, Woodinville, WA 98072 <br />February 14, 2024 <br />Imco Construction 20700 <br />44th Avenue West, Suite 110 <br />Lynnwood, WA 98036 <br />Job Information – FEB 2024 <br />6133 Lake Chaplain Rd <br />Monroe, WA 98272 <br />Picked Up Pricing <br />Light Loose Rip Rap <br />Crushed Surfacing Base Course/903.9(3) <br />Crushed Surfacing Top Course/903.9(3) <br />Quarry Spalls 4" X 8" <br />$38.53 per ton <br />$23.86 per ton <br />$24.15 per ton <br />$23.58 per ton <br />Hunter Nielsen <br />Builder's Supply <br />Additional pricing and/or hourly fees will apply to rejected loads. Quote is based off of 10 minute max aggregate unload time. <br />Prices valid through March 15th 2024. Prices are subject to change in the event of a delayed start, product price changes, expiring bid <br />pricing or product availability. Builder's Supply will not be responsible for suppliers no longer able to provide products or services. There <br />is a 6-hour minimum per truck per day. <br />Excludes: sales tax, permits, inspections, truck routes, road or lane closures, quarry opening fees, night or weekend work, traffic control, <br />public transportation interruptions, abnormal traffic disruptions and/or road closures out of Builder's Supply's control. Builder's Supply <br />will not be held responsible for any time/clean-up costs due to site track outs. <br />Import will be billed by the ton. All Loads must be full - half or partial loads subject to surcharges. <br />Truck & Trailer (T/T) delivery is assumed to be approximately 30 tons and Solo delivery is assumed to be approximately 14 tons. <br />Large quantities are subject to availability, and advance notice may be required. Excludes transfer trucks. <br />Detention of Trucks at the Job site: Prices quoted are based on prompt unloading of trucks. A maximum of 10 minutes free time per load <br />is allowed for unloading. Trucks held at the job site more than this time will be billed at the rate of $2.35 per minute for truck & trailer and <br />$2.00 per minute for solo loads. In case of repeated delays in unloading, Builder's Supply reserves the right to discontinue deliveries until <br />site conditions are corrected. <br />Page 1 of 1 <br />Thank you, <br />Solo Trucked Delivered <br />Light Loose Rip Rap <br />Crushed Surfacing Base Course/903.9(3) <br />Crushed Surfacing Top Course/903.9(3) <br />Quarry Spalls 4" X 8" <br />$63.71 per ton <br />$49.05 per ton <br />$49.34 per ton <br />$48.76 per ton <br />Truck & Trailer Delivered <br />Light Loose Rip Rap <br />Crushed Surfacing Base Course/903.9(3) <br />Crushed Surfacing Top Course/903.9(3) <br />Quarry Spalls 4" X 8" <br />$51.75 per ton <br />$37.09 per ton <br />$37.38 per ton <br />$36.80 per ton
The URL can be used to link to this page
Your browser does not support the video tag.