Laserfiche WebLink
Page 110 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LSUnit:1.00Quantity:Retainage Bond022-40Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />122,289.19122,289.19100.00122,289.19LS1.001.00Retainage Bond92116 <br />LSUnit:1.00Quantity:B&O Taxes022-50Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />158,975.95158,975.95100.00158,975.95LS1.001.00B&O Tax92117 <br />LSUnit:1.00Quantity:Builders Risk Insurance024-20Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />146,747.03146,747.03100.00146,747.03LS1.001.00Builders Risk Insurance92301 <br />LSUnit:1.00Quantity:Liability/Company Insurance024-70Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />517,671.67517,671.67100.00517,671.67LS1.001.00General Liability Insurance92306 <br />TOTAL NON-FEE APPLIED COSTS <br />Subtotal <br />TotalMisc 3TruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,888,805.820.000.003,025,182.79863,623.030.000.000.000.000.000.00Total <br />FINAL WORKS AMENDMENT TOTAL COST <br />Subtotal <br />TotalMisc 3TruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />25,707,420.870.00160,531.256,297,049.176,862,064.24592,707.706,430,103.932,068,572.383,296,392.201,188,484.642,107,907.56Total <br />WFP PH2 CAPITAL UPGRADES TOTAL PRICE <br />Subtotal <br />TotalMisc 3TruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />25,707,420.870.00160,531.256,297,049.176,862,064.24592,707.706,430,103.932,068,572.383,296,392.201,188,484.642,107,907.56Total <br />25,707,421160,5316,297,0496,862,064592,7086,430,1042,068,5723,296,3921,188,4852,107,908Total <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />Report Summary <br />Calendars Used In Estimate <br />50 Hour Week - (5@10)510 <br />45 Hour Week - (5@9)509 <br />40 Hour Week - (4@10)410 <br />In equipment resources, Rent % and EOE % that are not 100% are represented as XXX%YYY, where XXX = Rent % and YYY = EOE %