Laserfiche WebLink
PROPOSAL SUBMITTED TO:Date:1/31/2024 <br />IMCO Construction <br />BILLING ADDRESS:Contact:Mitchell Sorestad <br />Phone:360-305-9869 <br />E-mail:msorestad@imcoconstruction.com <br />JOB NAME AND LOCATION:Contact:Colbi Bertrand <br />Water Filter Plant - Phase 2 REVISED Phone:564-209-3401 <br />6133 Lake Chaplain Road E-mail:cbertrand@imcoconstruction.com <br />Monroe, WA 98272 Prevailing Wage NSP Job #: <br />- Prep by Others - <br />Pave with 4" of 1/2 HMA in two lifts +/- 717 tons @ $154.00 a ton 110,418.00$ <br />$2,000.00 per mobilization <br />Resale <br />EXCLUSIONS: Any Work Not Listed Above, Engineering, Layout, Testing, Traffic Control, Curbing, Utility Adjustments, Prime Coat, Bond, <br />Striping, Saw cutting, Sweeping, Permits, Fees, Misc. Patches, Survey, Material Transfer Device, Barricades, Sealcoating, Mobilizations, <br />Relocating Existing Utilities, Compaction Testing, Erosion Control, De-watering, Moving Obstructions, Coring, Towing, Notice Posting, <br />Prevailing Wage Rates, Sales Tax, Union Agreements, any and all union costs, and Insurance In Excess Of Current Limits. <br />TERMS: Pricing Void After 30 Days, Net Cash upon job completion, All jobs are subject to sales tax if a resale permit is not provided. <br />Jobs in excess of 30 days duration - Terms: Net Cash upon receipt of Progress Billing. <br />CONDITIONS: 1) This agreement is subject to Northshore Paving llc approval of purchaser's credit within ten days of the date of acceptance. <br />2) Northshore Paving llc shall not be liable for damage to or breakage of septic tanks, sprinkler systems, underground pipes and/ or conduits <br />not visible from the surface of the ground nor for any damage to approaches (including sidewalks) from the street to the property line. 3) It is <br />agreed if case suit is instituted to collect amount due on this contract or any portion thereof, reasonable attorney's fees and court costs will be <br />added to this contract. 4) Soil sterilization (weed killer) if included in contract, will be applied at rates specified by manufacturer. Northshore <br />Paving llc will not be responsible for any subsequent growths of horsetail weed, morning glory, deep-rooted ferns or perennials which have <br />not reached maturity prior to application or the re-growth of moss. 5) A finance charge of 1.5% per month will be charged on past due accounts <br />plus reasonable attorney's fees and/ or collection costs. 6) Quotations subject to change or cancellation after 30 days. 7) All agreements are <br />contingent on strikes, accidents, delays of carriers and other delays unavoidable or beyond our control. 8) Northshore Paving Inc. shall not be <br />responsible for sub grade failures, unsuitable sub grade or base rock, work preformed by others, or acts uncontrolled by man. 9) Any and all <br />state, county, municipal permits required for the above mentioned improvements will be obtained by purchaser unless otherwise stipulated in <br />this proposal. 10) Northshore Paving llc assumes all jobs to be NON-Public Works and completed during normal workday hours, unless <br />specified above. 11) Northshore Paving llc does not guarantee drainage on grades less than 1%. 12) Prices are based on current material <br />wholesale costs. Contracts extending into a new calendar year are subject or revision of price when an increase occurs. 13. This Proposal <br />must be included with the contract documents. 14. Northshore Paving llc is not responsible for any damages to vehicles or personal property <br />in working area. 15. Northshore Paving llc does not guarantee asphalt to be an inpervious surface. 16. Unmoved obstructions will not be moved by <br />Northshore Paving llc , an additional mobilization charge will be added to come back out to pave under any obstructions not moved including but not limited to dumpsters. <br /> 17.Everything is bid for one mobilization unless otherwise noted in proposal. Any additional mobilizations for any reason will be an extra charge to the customer. <br />18. Northshore recommends that new asphalt be seal coated. 19. Northshore Paving is Non-union and will not enter into any union agreements or costs. <br />20. Effective April 1st, 2022 any supplier energy surcharge passed onto Northshore Paving will now be passed directly to the customer and billed on your invoice in addition <br />to the above listed bid. 21. Invoice will be sent with amount due, customer has ten days to respond with any dispute or the full amount billed is accepted as due by customer. <br />By Signing below I hereby agree to and be held liable to all of the above mentioned contact entered into this _____ day of _____________, 2024. <br />Customer Authorized Signature: Northshore Paving Inc. Authorized Signature: <br /> x <br />Printed Name/ Company: Printed Name:Greg Ford 206-396-7110 <br /> WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES SUBJECT TO ALL TERMS AND CONDITIONS AS SET FORTH, AS FOLLOWS: <br />Prepared Grade By Others - Shall Be Firm, and Unyielding, and Ready To Receive Rock Or Asphalt. <br />P.O. Box 516 - Woodinville, WA. 98072 <br />Phone: 425-488-7725 - Fax: 425-402-8732 <br />License # NORTHPI 131 N4 <br /> - Proposal -