My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />Colbi Bertrand <br />From:Ben Daines <ben@bakerindnw.com> <br />Sent:Tuesday, April 2, 2024 9:10 AM <br />To:Colbi Bertrand <br />Cc:Mitchell Sorestad; James Janda; Todd Pike; Brad Florentin <br />(BradFlorentin@kennedyjenks.com); Jonathan Anderson; Aaron Wu <br />Subject:RE: 4211 COE WFP Chemical Building Fill Station <br />Attachments:2100-56-56-56OB2DS FRONT DOORS.doc <br />Importance:High <br />Colbi, <br /> <br />I contacted a Distributor “ Source North America” whom we could sell this cabinet through. They will also be able to <br />quote any other fittings that will be needed. We are only supplying the cabinet. I needed to get an estimate from them <br />on what their price would be. I feel we may still have items that may need to be added but this price should be pretty <br />accurate. Please forward this email to whomever may want to make changes. <br /> <br />(1)2100-56-56-56OB2DS “Custom”……$16035.00 EA (56” x 56 x 56” stainless type 304 steel enclosure with an open <br />bottom. Two doors with compression latches. The cabinet will have a center post between the two doors. The cabinet <br />will include a removable back bolt on panel. We can include some type of support bracket that could be bolted to the <br />cabinet, but this may need to be an additional charge depending on the time of the order. Also lead time and price may <br />increase depending on material availability and price at time of the order. The drawing is a “Generic” drawing and not <br />the final revision for the unit. Please use for Illustrative purposes only. We can make adjustments and add just about <br />anything needed. Note: Stainless steel will enhance distortion, welds and forming imperfections that will <br />be more visible in different lighting. These are standard in the fabrication process. Our standard orbital <br />finish blends these areas slightly but does not remove anything considered standard in the <br />Manufacturing process. Material for Stainless orders cannot be cancelled once ordered. Stainless <br />cannot be cancelled or returned once fabricated ) <br /> <br />Lead time will be approximately 6-8 weeks. Similar style cabinet below that is 120” wide x 55” tall x 48” <br />deep in stainless steel. <br /> <br />Thanks, Ben
The URL can be used to link to this page
Your browser does not support the video tag.