Page 11 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,416.75880.100010.00001.7000741.67591.00001.0000741.6759 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />209.3241110.35573.00000.333351.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:17.00Crew Hrs:100.00Eff:1UHProd:(Mod) Excav L644/2 MenEL642Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />917.5653.97109.7549.58HR17.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />4,563.80268.46109.7590.74HR17.001.00JD 644 Loader 4.5 CY 313%8LD644 <br />1,498.9988.18109.7584.71HR17.001.00Solo Dump Trk 10 TCY8TKHS10 <br />1,934.83113.81110.0065.51MH17.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />1,920.62112.98110.0065.01MH17.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />1,772.69104.28110.0059.77MH17.001.00Operator TeamsterOT <br />EAUnit:17.00Quantity:Sold Pile - F/I Sold Pile269-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />80,942.130.000.00-26,402.0092,225.000.0010,003.505,115.631,896.533,219.10Total <br />4,761.300.000.00-1,553.065,425.000.00588.44300.92111.56189.36U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />47,613.01760.100010.00001.7000889.36061.00001.0000889.3606 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />189.3588100.30653.00000.333351.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:17.00Crew Hrs:100.00Eff:1UHProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Malcolm's supply is less, but they are only assuming 8' exposed and smaller WF - keep our sizing until fully engineered <br />Credit from Malcolm to not mobilize and loft H piles - use IMCO's crane and operator <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />92,225.00108.50108.50100.00CWT850.001.00Buy HP Piling3PLHB <br />-26,402.00-26,402.00100.00-26,402.00LS1.001.00MALCOLM - Soldier Pile Sub4SP <br />10,003.50588.44109.75358.34HR17.001.00Grove RT880E 80 Ton 159%8CRRG8 <br />1,751.26103.02110.0059.01MH17.001.00Carpenter JourneymanCJ <br />1,408.1182.83110.0046.86MH17.001.00Laborer - General G3/4LG <br />1,956.26115.07110.0066.27MH17.001.00Oper Crane <100T G1OC1 <br />MBFUnit:9.00Quantity:Sold Pile - Timber Lagging269-25Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />32,594.910.000.000.0014,647.500.004,040.3213,907.095,143.768,763.33Total <br />3,621.660.000.000.001,627.500.00448.921,545.23571.53973.70U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,828.87560.75001.33336.7500265.88760.13337.50001,994.1567 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />973.7033103.015515.00000.0667135.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:2.00Labor Pcs:67.50Crew Hrs:100.00Eff:0.1333UHProd:(Mod) Carpenter Crew - 4 ManC4Crew: <br />Equipment to excavate and push lagging is in excavation bid item <br />Malcolms supply price is less, but they are only assuming 8' face - keep our price until fully detailed and engineered <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />14,647.501,627.50108.501,500.00MBF9.001.004x6 Timber Lagging34X6LAGGING <br />1,874.9227.78109.7526.38HR67.501.00Genie 842 Forklift 8K 42'8FL08