|
Page 10 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />10,000.0010,000.00100.0010,000.00LOT1.001.00Core Drill4SCDRILL
<br />2,158.9753.97109.7549.58HR40.001.00Takeuchi 135 Excvatr 3.5MT8EX135T
<br />1,597.9639.95109.7536.40HR40.001.00Scissor Lift 20' Elec OSR8MLS20
<br />4,120.62103.02110.0059.01MH40.001.00Carpenter JourneymanCJ
<br />3,313.2282.83110.0046.86MH40.001.00Laborer - General G3/4LG
<br />4,519.10112.98110.0065.01MH40.001.00Oper Dzr->D9/Ex->15MT G3O3
<br />LS1.00012000Takeoff Qty:
<br />Bid Qty:
<br />LARGE DIAMETER VALVESBiditem
<br />1.000 LS
<br />EAUnit:7.00Quantity:Large Diameter Valve Purchase655-50Activity:
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />667,000.00667,000.00100.00667,000.00LS1.001.00FERGUSON - Pipe - Valve
<br />Purchase2PIVALVES
<br />LS1.00013000Takeoff Qty:
<br />Bid Qty:
<br />PUD VALVES AND SCREENHOUSE VALVE / AIR GAPBiditem - Parent
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />1,671,724.706,975.000.00738,755.95177,245.60132,491.70257,899.82358,356.63130,728.09227,628.54Total
<br />1,671,724.706,975.000.00738,755.95177,245.60132,491.70257,899.82358,356.63130,728.09227,628.54U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0000103.125765.5056481.07883,474.95000.00033,474.9500
<br />LS1.00013010Takeoff Qty:
<br />Bid Qty:
<br />SHORINGBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />424,439.745,400.000.00174,626.01139,422.500.0051,759.6253,231.6119,722.5133,509.10Total
<br />424,439.745,400.000.00174,626.01139,422.500.0051,759.6253,231.6119,722.5133,509.10U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0044101.008763.5846805.3885527.00000.0019527.0000
<br />LSUnit:1.00Quantity:Sold Pile - SUB Drill Mob269-05Activity:
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />88,581.0088,581.00100.0088,581.00LS1.001.00MALCOLM - Soldier Pile Sub4SP
<br />EAUnit:17.00Quantity:Sold Pile - SUB Drill Shaft269-10Activity:
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />112,447.016,614.53100.006,614.53EA17.001.00MALCOLM - Soldier Pile Sub4SP
<br />EAUnit:17.00Quantity:Sold Pile - Spoil Handle269-15Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />12,608.490.000.000.000.000.006,980.355,628.142,069.633,558.51Total
<br />741.680.000.000.000.000.00410.61331.07121.74209.32U. Cost
|