Laserfiche WebLink
Page 13 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />0.0038110.355469.77462,089.765472.00000.013972.0000 <br />EAUnit:8.00Quantity:Dewatering Sub Support655-97Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />14,367.630.000.000.000.000.006,422.047,945.592,921.825,023.77Total <br />1,795.950.000.000.000.000.00802.76993.20365.23627.97U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,986.51250.30003.33332.4000598.65130.33333.00001,795.9538 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />627.9713110.35549.00000.111172.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:24.00Crew Hrs:100.00Eff:3HUProd:(Mod) Excav X200/2 MenE202Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,295.3853.97109.7549.58HR24.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />3,010.43125.43109.75115.48HR24.001.00JD 200 Excavator 20MT8EX200 <br />2,116.2388.18109.7584.71HR24.001.00Solo Dump Trk 10 TCY8TKHS10 <br />2,731.52113.81110.0065.51MH24.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />2,711.45112.98110.0065.01MH24.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />2,502.62104.28110.0059.77MH24.001.00Operator TeamsterOT <br />MOUnit:2.00Quantity:SUB Dewatering655-98Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />126,095.480.000.00126,095.480.000.000.000.000.000.00Total <br />63,047.740.000.0063,047.740.000.000.000.000.000.00U. Cost <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />NOTES: includes mob <br />$184,500 for 13 wells ~ $14,250 ea <br />8 @ Screenhouse area <br />5 @ CFDS area <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />113,538.4814,192.31100.0014,192.31EA8.001.00MALCOLM - SUB - Dewatering <br />Install4DWINSTALL <br />12,557.006,278.50100.006,278.50MO2.001.00MALCOLM - SUB - Dewatering <br />Monthly4DWOPERATE <br />LSUnit:1.00Quantity:ELECTRICAL SUB906-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,000.0010,000.00100.0010,000.00LS1.001.00SERVICE - Electrical Sub4EL <br />LS1.00013030Takeoff Qty: <br />Bid Qty: <br />EXCAVATIONBiditem - Parent <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />205,923.981,575.000.0016,368.007,443.108,687.7074,022.6197,827.5734,966.5462,861.03Total <br />205,923.981,575.000.0016,368.007,443.108,687.7074,022.6197,827.5734,966.5462,861.03U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0000101.565265.2627213.7915963.20000.0010963.2000 <br />DEMOLITIONBiditem