Laserfiche WebLink
Page 14 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00013040Takeoff Qty: <br />Bid Qty:1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />6,152.261,575.000.00468.00390.600.001,751.811,966.85696.621,270.23Total <br />6,152.261,575.000.00468.00390.600.001,751.811,966.85696.621,270.23U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.057198.342563.5115307.613020.00000.050020.0000 <br />LFUnit:120.00Quantity:Sawcut ACP113-05Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />468.000.65100.000.65INFT720.001.00Saw Cut - ACP4SCA <br />SFUnit:3000.00Quantity:Remove ACP113-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,718.660.000.000.000.000.001,751.811,966.85696.621,270.23Total <br />1.240.000.000.000.000.000.580.660.230.42U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,718.66000.00033,000.00001.0000371.8660300.00000.00331.2396 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.423498.34250.0067150.000020.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:300UHProd:Excav X330/2 MenE332Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,751.81175.18109.75161.48HR10.001.00JD 330 Excavator 33MT8EX330 <br />844.5484.45110.0049.38MH10.001.00Laborer - Grade Checker G4LGC <br />1,122.31112.23110.0066.10MH10.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />TCYUnit:60.00Quantity:Haul Demo ACP -> Waste113-40Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,965.601,575.000.000.00390.600.000.000.000.000.00Total <br />32.7626.250.000.006.510.000.000.000.000.00U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,620.80000.012580.00000.75000.00008.00000.12500.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:0.00Labor Pcs:7.50Crew Hrs:100.00Eff:8UHProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />390.606.51108.506.00TCY60.001.00Dump Fee ACP/TCY3DFACP <br />1,575.00175.00100.00175.00HR9.001.00Truck & Trailer - OPER5HHDTP <br />LS1.00013050Takeoff Qty: <br />Bid Qty: <br />POTHOLING / UTILITY RELOCATEBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />54,289.020.000.0010,600.000.005,666.5012,400.1925,622.339,277.1516,345.18Total <br />54,289.020.000.0010,600.000.005,666.5012,400.1925,622.339,277.1516,345.18U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours