Laserfiche WebLink
Page 30 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,884.880.000.000.000.000.00875.901,008.98373.87635.11Total <br />62.830.000.000.000.000.0029.2033.6312.4621.17U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,769.76000.016760.00000.5000376.97606.00000.166762.8293 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />21.1703100.89800.33333.000010.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:5.00Crew Hrs:100.00Eff:6UHProd:Excav X330/2 MenE332Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />875.90175.18109.75161.48HR5.001.00JD 330 Excavator 33MT8EX330 <br />435.0587.01110.0049.38MH5.001.00Laborer - Grade Checker G4LGC <br />573.93114.79110.0066.10MH5.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />LS1.00015040Takeoff Qty: <br />Bid Qty: <br />POTHOLING / UTILITY RELOCATEBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />29,558.740.000.003,180.000.003,966.606,854.1715,557.975,659.109,898.87Total <br />29,558.740.000.003,180.000.003,966.606,854.1715,557.975,659.109,898.87U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.016799.730663.4543189.4791156.00000.0064156.0000 <br />EAUnit:6.00Quantity:Pothole - Backhoe065-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />7,195.100.000.000.000.000.002,257.834,937.271,754.813,182.46Total <br />1,199.180.000.000.000.000.00376.31822.88292.47530.41U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,997.27780.30003.33331.8000399.72780.33333.00001,199.1833 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />530.410091.43099.00000.111154.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:18.00Crew Hrs:100.00Eff:9MUProd:Labor X160/3 MenLX3Crew: <br />Pothole backhoe to excavate overburden and get close to utilities <br />Pothole Vactor to get from open cut areas to and past utilities <br />Sample lines <br />Injection (alum, poly, chlorine, fluoride, etc) <br />Chemicals <br />Fire Water <br />Water <br />Storm <br />Misc. Utilities <br />Must treat all abandoned utilities as live until determined otherwise. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,257.83125.44109.75115.48HR18.001.00JD 200 Excavator 20MT8EX200 <br />1,504.7483.60110.0048.86MH18.001.00Laborer ForemanLF <br />1,444.9480.27110.0046.86MH18.001.00Laborer - General G3/4LG <br />1,987.59110.42110.0065.01MH18.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />EAUnit:6.00Quantity:Pothole - Vactor Truck065-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />4,143.290.000.003,180.000.000.000.00963.29344.74618.55Total <br />690.550.000.00530.000.000.000.00160.5557.46103.09U. Cost