My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 29 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,782.99673.00000.33333.0000728.29970.033330.000021,848.9900 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />9,402.010099.6429150.00000.0067150.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />4.00Equipment Pcs:5.00Labor Pcs:30.00Crew Hrs:100.00Eff:30HUProd:(Mod) Carpenter Crew - 4 ManC4Crew: <br />CMA - Anchors, Threaded Rod, Nuts, Washers, Rope, Clips, etc.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,500.001.00100.001.00DOL1,500.001.00Perm Matl Allowance2CMA <br />833.3027.78109.7526.38HR30.001.00Genie 842 Forklift 8K 42'8FL08 <br />5,114.5885.24109.7577.87HR60.002.0040' Manlift OSR8ML040 <br />954.6831.82109.7530.68HR30.001.00Ford F450 Flatbed8TKJ450 <br />3,190.13106.34110.0061.01MH30.001.00Carpenter ForemanCF <br />9,271.39103.02110.0059.01MH90.003.00Carpenter JourneymanCJ <br />2,484.9182.83110.0046.86MH30.001.00Laborer - General G3/4LG <br />SYUnit:140.00Quantity:Stripping -Push Up203-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,115.590.000.000.000.000.00525.54590.05208.98381.07Total <br />7.970.000.000.000.000.003.754.211.492.72U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,718.63330.0021466.66670.3000371.863346.66670.02147.9685 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2.721998.34170.042923.33336.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:3.00Crew Hrs:100.00Eff:0.0214HUProd:Excav X330/2 MenE332Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />525.54175.18109.75161.48HR3.001.00JD 330 Excavator 33MT8EX330 <br />253.3684.45110.0049.38MH3.001.00Laborer - Grade Checker G4LGC <br />336.69112.23110.0066.10MH3.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />TCYUnit:40.00Quantity:Stripping - Load/Haul203-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,187.47700.000.000.000.000.00700.72786.75278.65508.10Total <br />54.6917.500.000.000.000.0017.5219.676.9712.70U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,468.67500.0100100.00000.4000371.867510.00000.100037.1868 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />12.702598.34380.20005.00008.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:4.00Crew Hrs:100.00Eff:10UHProd:Excav X330/2 MenE332Crew: <br />removed dump fee - save for reuseNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />700.00175.00100.00175.00HR4.001.00Truck & Trailer - OPER5HHDTP <br />700.72175.18109.75161.48HR4.001.00JD 330 Excavator 33MT8EX330 <br />337.8284.46110.0049.38MH4.001.00Laborer - Grade Checker G4LGC <br />448.93112.23110.0066.10MH4.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />TNUnit:30.00Quantity:Stripping - Move existing RipRap for Reuse203-25Activity:
The URL can be used to link to this page
Your browser does not support the video tag.