Laserfiche WebLink
Page 32 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TCYUnit:443.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,647.060.000.000.000.000.008,826.136,820.932,411.154,409.78Total <br />35.320.000.000.000.000.0019.9215.405.449.95U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,064.13540.0050200.00002.2150706.413520.00000.050035.3207 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />9.9544102.64760.15006.666766.4500 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:22.15Crew Hrs:100.00Eff:20UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Excavate area to approximate 4' cut to have working shelf for relocating utilities and securing <br />20 TCY / CH <br />Excavate and pack off asphalt w/ loader <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,778.38125.43109.75115.48HR22.151.00JD 200 Excavator 20MT8EX200 <br />3,880.25175.18109.75161.48HR22.151.00JD 330 Excavator 33MT8EX330 <br />2,167.5097.86109.7590.74HR22.151.00JD 644 Loader 4.5 CY8LD644 <br />1,870.6684.45110.0049.38MH22.151.00Laborer - Grade Checker G4LGC <br />2,485.91112.23110.0066.10MH22.151.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />2,464.36111.26110.0065.51MH22.151.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00015060Takeoff Qty: <br />Bid Qty: <br />MASS EXCAVATIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,152.580.000.000.000.000.008,547.216,605.372,334.944,270.43Total <br />15,152.580.000.000.000.000.008,547.216,605.372,334.944,270.43U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0466102.647666.3625235.471364.35000.015564.3500 <br />TCYUnit:858.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,152.580.000.000.000.000.008,547.216,605.372,334.944,270.43Total <br />17.660.000.000.000.000.009.967.702.724.98U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,064.13990.0025400.00002.1450706.414040.00000.025017.6603 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />4.9772102.64760.075013.333364.3500 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:21.45Crew Hrs:100.00Eff:40UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Mass excavation - Quicker production - assume past shallow utilities, but need to start setting shoring (E Blocks, Plates, <br />etc) <br />40 TCY / CH <br />Excavate and pack off asphalt w/ loader <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,690.58125.43109.75115.48HR21.451.00JD 200 Excavator 20MT8EX200 <br />3,757.63175.18109.75161.48HR21.451.00JD 330 Excavator 33MT8EX330 <br />2,099.0097.86109.7590.74HR21.451.00JD 644 Loader 4.5 CY8LD644