Laserfiche WebLink
Page 33 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1,811.5484.45110.0049.38MH21.451.00Laborer - Grade Checker G4LGC <br />2,407.35112.23110.0066.10MH21.451.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />2,386.48111.26110.0065.51MH21.451.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00015070Takeoff Qty: <br />Bid Qty: <br />EX SUPPORT / MISCBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />18,933.450.000.000.003,255.002,628.105,017.408,032.952,977.805,055.15Total <br />18,933.450.000.000.003,255.002,628.105,017.408,032.952,977.805,055.15U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0250100.411963.1894236.668180.00000.012580.0000 <br />EAUnit:4.00Quantity:Local Dewatering / Sumping296-02Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />9,780.170.000.000.003,255.000.002,508.704,016.471,488.902,527.57Total <br />2,445.040.000.000.00813.750.00627.181,004.12372.23631.89U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,890.08500.50002.00002.0000326.25850.20005.00001,631.2925 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />631.8925100.411810.00000.100040.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:20.00Crew Hrs:100.00Eff:5HUProd:Excav X200/2 MenE202Crew: <br />CMA for sumps, pumps, hoses, discharge piping, etc.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,255.001.09108.501.00DOL3,000.001.00Consumable Matl Allowance3CMA <br />2,508.70125.44109.75115.48HR20.001.00JD 200 Excavator 20MT8EX200 <br />1,740.2087.01110.0049.38MH20.001.00Laborer - Grade Checker G4LGC <br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />TNUnit:42.00Quantity:Subgrade Stabilization296-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />4,071.670.000.000.000.001,461.601,003.481,606.59595.561,011.03Total <br />96.940.000.000.000.0034.8023.8938.2514.1824.07U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,089.58750.019052.50000.8000326.25885.25000.190562.1445 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />24.0721100.41190.38102.625016.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:8.00Crew Hrs:100.00Eff:5.25UHProd:Excav X200/2 MenE202Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,461.6034.80100.0034.80TON42.001.00HEIDLBRGMAT - Quarry Spalls <br />FOB Job2AJSRS <br />1,003.48125.44109.75115.48HR8.001.00JD 200 Excavator 20MT8EX200 <br />696.0887.01110.0049.38MH8.001.00Laborer - Grade Checker G4LGC <br />910.51113.81110.0065.51MH8.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />SFUnit:1560.00Quantity:Fine Grading296-08Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor