Page 34 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />5,081.610.000.000.000.001,166.501,505.222,409.89893.341,516.55Total
<br />3.260.000.000.000.000.750.961.540.570.97U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,234.67500.00081,300.00001.2000326.2592130.00000.00772.5097
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />0.9721100.41210.015465.000024.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:2.00Labor Pcs:12.00Crew Hrs:100.00Eff:130UHProd:Excav X200/2 MenE202Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,166.5023.33100.0023.33TON50.001.00LAKESIDE - Cr Surf Top Course
<br />FOB Job2AJCSTC
<br />1,505.22125.44109.75115.48HR12.001.00JD 200 Excavator 20MT8EX200
<br />1,044.1287.01110.0049.38MH12.001.00Laborer - Grade Checker G4LGC
<br />1,365.77113.81110.0065.51MH12.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />LS1.00015080Takeoff Qty:
<br />Bid Qty:
<br />STRUCTURALBiditem - Parent
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />2,323,058.6312,000.000.00371,020.00155,671.13559,348.77488,584.40736,434.33273,210.61463,223.72Total
<br />2,323,058.6312,000.000.00371,020.00155,671.13559,348.77488,584.40736,434.33273,210.61463,223.72U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.000099.528862.6045313.96047,399.21000.00017,399.2100
<br />LS1.00015085Takeoff Qty:
<br />Bid Qty:
<br />BLOBBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />80,078.190.000.002,030.00781.2049,197.546,711.0421,358.417,948.2913,410.12Total
<br />80,078.190.000.002,030.00781.2049,197.546,711.0421,358.417,948.2913,410.12U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.017996.209160.4059360.7126222.00000.0045222.0000
<br />SFUnit:180.00Quantity:Gen Conc-FabF Wall420-08Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />1,713.710.000.000.00683.550.000.001,030.16381.02649.14Total
<br />9.520.000.000.003.800.000.005.722.123.61U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />3,427.42000.0028360.00000.5000206.032036.00000.02785.7231
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />3.6063103.01600.055618.000010.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.00Equipment Pcs:2.00Labor Pcs:5.00Crew Hrs:100.00Eff:18UMProd:Carpenter Crew - 2 ManC2Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />683.553.80108.503.50SF180.001.00Wooden Forms Std (SF)3FWS
<br />1,030.16103.02110.0059.01MH10.002.00Carpenter JourneymanCJ
<br />SFUnit:180.00Quantity:Gen Conc-S/S Wall Forms420-22Activity:
|