My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 42 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />3.50Equipment Pcs:0.50Labor Pcs:880.00Crew Hrs:100.00Eff:176HUProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />25,000.005,000.00109.755,000.00MO5.001.00→ Concrete Forming Tools & <br />Equip8CONCFRMTLS <br />119,982.72272.69109.75371.29HR440.000.50Mantwoc M85 90 T Crwlr %58CRCM85 <br />24,443.3827.78109.7526.38HR880.001.00Genie 842 Forklift 8K 42'8FL08 <br />75,013.8085.24109.7577.87HR880.001.0040' Manlift OSR8ML040 <br />35,155.1239.95109.7536.40HR880.001.00Scissor Lift 20' Elec OSR8MLS20 <br />51,621.52117.32110.0067.63MH440.000.50Oper Crane >200T G1AAOC3 <br />EAUnit:1700.00Quantity:Rebar Dowels460-65Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />195,998.300.000.000.000.0057,743.0043,473.9094,781.4035,387.0459,394.36Total <br />115.290.000.000.000.0033.9725.5755.7520.8234.94U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,843.10390.030033.333351.0000271.08883.33330.300081.3266 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />34.937992.92290.60001.66671,020.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:510.00Crew Hrs:100.00Eff:0.3HUProd:(Mod) Labor Crew - 1 ManL1Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />34,000.0020.00100.0020.00EA1,700.001.00ANCHOR BOLTS & TEMPLATS2AB <br />23,743.0050.00100.0050.00TUBE474.861.00Epoxy Grout (36 in3/tube)2BMMEG <br />43,473.9085.24109.7577.87HR510.001.0040' Manlift OSR8ML040 <br />52,537.87103.02110.0059.01MH510.001.00Carpenter JourneymanCJ <br />42,243.5382.83110.0046.86MH510.001.00Laborer - General G3/4LG <br />SFUnit:1700.00Quantity:Scarify Surfaces460-70Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />33,128.240.000.000.005,425.000.0012,478.1815,225.065,704.709,520.36Total <br />19.490.000.000.003.190.007.348.963.365.60U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,846.15660.0033299.99985.6667488.880430.00000.033316.2960 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5.600289.55920.100010.0000170.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:56.67Crew Hrs:100.00Eff:30UHProd:(Mod) Labor Sand Blstr/AC185/2MenLS2Crew: <br />CMA - new heads / bitsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,425.001.09108.501.00DOL5,000.001.00Consumable Matl Allowance3CMA <br />2,817.6049.72109.7545.99HR56.671.00185 CFM Compressor8AC185 <br />9,660.5885.24109.7577.87HR113.332.0040' Manlift OSR8ML040 <br />5,837.88103.02110.0059.01MH56.671.00Carpenter JourneymanCJ <br />9,387.1882.83110.0046.86MH113.332.00Laborer - General G3/4LG <br />DAYUnit:30.00Quantity:Gen Conc - Cold Weather Protect482-75Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />44,491.130.000.000.0024,412.500.000.0020,078.637,575.5912,503.04Total <br />1,483.040.000.000.00813.750.000.00669.29252.52416.77U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,415.18830.20005.00006.0000334.64380.50002.0000669.2877
The URL can be used to link to this page
Your browser does not support the video tag.