Laserfiche WebLink
Page 43 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />416.768083.66108.00000.1250240.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:4.00Labor Pcs:60.00Crew Hrs:100.00Eff:2HUProd:Conc Cure/Protect 4 MenCPC4Crew: <br />** Add heater rent, fuel and visqueen/thermal blankets as appropriate. ** <br />Plug price of heater includes fuel <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />8,137.505.43108.505.00SF1,500.001.00Cure Blanket Insultd (12x25)3CCICB <br />16,275.00542.50108.50500.00DAY30.001.00Heater3HEATER <br />5,169.1586.15110.0048.86MH60.001.00Laborer ForemanLF <br />14,909.4882.83110.0046.86MH180.003.00Laborer - General G3/4LG <br />EAUnit:3.00Quantity:Leak Testing497-02Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,476.480.000.000.001,627.500.000.008,848.983,286.505,562.48Total <br />3,492.160.000.000.00542.500.000.002,949.661,095.501,854.16U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,328.10671.50000.66674.5000196.64400.066715.00002,949.6600 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,854.160098.322030.00000.033390.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:45.00Crew Hrs:100.00Eff:15HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />Misc leak testing items <br />Tubs <br />Visqueen <br />Adhesive level indicators <br />etc. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,627.501.09108.501.00DOL1,500.001.00Consumable Matl Allowance3CMA <br />3,727.3782.83110.0046.86MH45.001.00Laborer - General G3/4LG <br />5,121.61113.81110.0065.51MH45.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:1.00Quantity:Floc Basin Wall Spool720-21Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />6,802.900.000.000.000.000.00555.536,247.372,308.563,938.81Total <br />6,802.900.000.000.000.000.00555.536,247.372,308.563,938.81U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,401.45002.00000.50002.0000340.14500.050020.00006,802.9000 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,938.8100104.122860.00000.016760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20CHProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />Purchase in large pipe itemNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08 <br />2,126.75106.34110.0061.01MH20.001.00Carpenter ForemanCF <br />4,120.62103.02110.0059.01MH40.002.00Carpenter JourneymanCJ <br />METALSBiditem