Laserfiche WebLink
Page 46 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,751.565093.158230.00000.033360.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />18,500.009,250.00100.009,250.00DAY2.001.00CRUX - SUB - Diving Sub4DIVING <br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08 <br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG <br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00015110Takeoff Qty: <br />Bid Qty: <br />BACKFILL AND RESTORATIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />130,560.010.000.000.000.0068,922.5027,705.8333,931.6811,995.6321,936.05Total <br />130,560.010.000.000.000.0068,922.5027,705.8333,931.6811,995.6321,936.05U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0090102.432266.2200394.1315331.26000.0030331.2600 <br />TONUnit:1000.00Quantity:Grav Borrow - Purch FOB Job231-15Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />Backfill around outlet box and under overflow structure - Remaining needed from re-used excavated materialsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />19,000.0019.00100.0019.00TON1,000.001.00GIRARD - Gravel Borrow FOB <br />Job2AJBGB <br />TONUnit:871.00Quantity:Grav Borrow - Haul231-25Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />8,349.110.000.000.000.000.003,240.675,108.441,809.803,298.64Total <br />9.590.000.000.000.000.003.725.872.083.79U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,792.83010.0020500.00001.7420479.283050.00000.02009.5857 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3.787297.75050.060016.666752.2600 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:3.00Labor Pcs:17.42Crew Hrs:100.00Eff:50UHProd:(Mod) Excav L644/2 MenEL642Crew: <br />Assuming over 67% is onsite haul from stockpile locationNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,704.6497.86109.7590.74HR17.421.00JD 644 Loader 4.5 CY8LD644 <br />1,536.0388.18109.7584.71HR17.421.00Solo Dump Trk 10 TCY8TKHS10 <br />1,398.3780.27110.0046.86MH17.421.00Laborer - General G3/4LG <br />1,938.11111.26110.0065.51MH17.421.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />1,771.96101.72110.0059.77MH17.421.00Operator TeamsterOT <br />TONUnit:2300.00Quantity:Grav Borrow - Embank231-30Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />35,624.820.000.000.000.000.0016,144.0819,480.746,876.9112,603.83Total <br />15.490.000.000.000.000.007.028.472.995.48U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit