Laserfiche WebLink
Page 52 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />6,180.530098.3220100.00000.0100100.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:2.00Labor Pcs:50.00Crew Hrs:100.00Eff:50CHProd:Demo X200/Brkr/2 MenDMX2Crew: <br />3347 SF x 150 lbs = 251 TonsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />32,550.00130.20108.50120.00TN250.001.00Trash Dump Fee3DFTRSH <br />2,478.1649.56109.7545.16HR50.001.00Hyd Brker 5 K (Min JD 200)8DMB05 <br />6,271.74125.43109.75115.48HR50.001.00JD 200 Excavator 20MT8EX200 <br />4,141.5282.83110.0046.86MH50.001.00Laborer - General G3/4LG <br />5,690.68113.81110.0065.51MH50.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />TCYUnit:825.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />32,122.120.000.000.000.000.0014,864.6217,257.506,095.3111,162.19Total <br />38.940.000.000.000.000.0018.0220.927.3913.53U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,787.18060.0050200.00004.1250778.718120.00000.050038.9359 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />13.5299104.59090.20005.0000165.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:41.25Crew Hrs:100.00Eff:20UHProd:(Mod) Excav X330/2 MenE332Crew: <br />20 TCY / CH <br />Excavate and push up - assume most of the material is re-usable <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,464.2459.74109.7555.22HR41.251.00Cat D5 Komatsu GPS IMCO8DZ5 <br />5,174.18125.43109.75115.48HR41.251.00JD 200 Excavator 20MT8EX200 <br />7,226.20175.18109.75161.48HR41.251.00JD 330 Excavator 33MT8EX330 <br />3,483.7384.45110.0049.38MH41.251.00Laborer - Grade Checker G4LGC <br />4,629.50112.23110.0066.10MH41.251.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />4,589.38111.26110.0065.51MH41.251.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />4,554.89110.42110.0065.01MH41.251.00Oper Dzr->D9/Ex->15MT G3O3 <br />TONUnit:1038.00Quantity:Grav Borrow - Purch FOB Job231-15Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />19,722.0019.00100.0019.00TON1,038.001.00GIRARD - Gravel Borrow FOB <br />Job2AJBGB <br />TNUnit:100.00Quantity:Pipe Bedding - Purch FOB Job231-16Activity: <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />0.00000.00000.00000.00000.00000.00000.00000.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:0.00Labor Pcs:0.00Crew Hrs:100.00Eff:0Prod:*** BACKFILL CREWS ***BFCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,900.0019.00100.0019.00TON100.001.00GIRARD - Bk Run Gvl Trnch Drn <br />FOB Job2AJGBR <br />TONUnit:1038.00Quantity:Grav Borrow - Embank231-30Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor