My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 53 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />19,444.090.000.000.000.000.008,822.9710,621.123,754.996,866.13Total <br />18.730.000.000.000.000.008.5010.233.626.61U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,619.67920.0033300.00003.4600561.967930.00000.033318.7323 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />6.6148102.32290.100010.0000103.8000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />5.00Equipment Pcs:3.00Labor Pcs:34.60Crew Hrs:100.00Eff:30UHProd:(Mod) Embank D6/RL/WT/4 MenEMD4Crew: <br />mixture of site fill and trench backfillNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />873.5525.25109.7523.27HR34.601.0047" Dbl Drum Roller 3 MT OSR8CMDD4 <br />640.8018.52109.7516.88HR34.601.00Hoe Pack Excavator Mount8CMHP <br />1,867.5153.97109.7549.58HR34.601.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />4,340.04125.43109.75115.48HR34.601.00JD 200 Excavator 20MT8EX200 <br />1,101.0731.82109.7530.68HR34.601.00Ford F450 Flatbed8TKJ450 <br />2,922.1084.45110.0049.38MH34.601.00Laborer - Grade Checker G4LGC <br />7,699.02111.26110.0065.51MH69.202.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LSUnit:1.00Quantity:Shaft-SUB Constrct Shaft276-54Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />Price does not include reinforcing - see alternate - next itemNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />216,260.00216,260.00100.00216,260.00LS1.001.00MALCOLM - Drilled Shaft Sub4DS <br />LSUnit:1.00Quantity:Shaft-SUB Reinforcing Supply276-55Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />101,250.00101,250.00100.00101,250.00LS1.001.00MALCOLM - Drilled Shaft Sub4DS <br />EAUnit:29.00Quantity:Sub - IMCO Support285-22Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />55,412.740.000.000.000.000.0019,399.9336,012.8113,362.6422,650.17Total <br />1,910.780.000.000.000.000.00668.961,241.82460.78781.04U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,643.13660.25004.00007.2500764.31370.40002.50001,910.7841 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />781.040399.345712.50000.0800362.5000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:5.00Labor Pcs:72.50Crew Hrs:100.00Eff:2.5HUProd:(Mod) Excav X200/2 MenE202Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,913.1453.97109.7549.58HR72.501.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />9,094.02125.43109.75115.48HR72.501.00JD 200 Excavator 20MT8EX200 <br />6,392.7788.18109.7584.71HR72.501.00Solo Dump Trk 10 TCY8TKHS10 <br />12,010.4282.83110.0046.86MH145.002.00Laborer - General G3/4LG <br />8,251.49113.81110.0065.51MH72.501.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />8,190.88112.98110.0065.01MH72.501.00Oper Dzr->D9/Ex->15MT G3O3 <br />7,560.02104.28110.0059.77MH72.501.00Operator TeamsterOT <br />EAUnit:29.00Quantity:Sub - IMCO Support Reinforcing Install285-23Activity:
The URL can be used to link to this page
Your browser does not support the video tag.