My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 58 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />200.021195.60573.33330.300030.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:5.00Labor Pcs:6.00Crew Hrs:100.00Eff:0.3UMProd:Conc Pour 5 MenCP5Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,852.36186.35100.00186.35CY9.941.00SMPOINT - Class 4500 Concrete2CNR45 <br />225.00225.00100.00225.00EA1.001.00WESTERN - 28 M Conc Pump - <br />Travl4OP28T <br />35.553.75100.003.75CY9.481.05WESTERN - 28 M Conc Pump - <br />Yrdage4OP28Y <br />190.9431.82109.7530.68HR6.001.00Ford F450 Flatbed8TKJ450 <br />638.03106.34110.0061.01MH6.001.00Carpenter ForemanCF <br />1,236.18103.02110.0059.01MH12.002.00Carpenter JourneymanCJ <br />993.9682.83110.0046.86MH12.002.00Laborer - General G3/4LG <br />SFUnit:400.00Quantity:Gen Conc-Cure Top Curb420-52Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />269.330.000.000.0056.420.000.00212.9180.24132.67Total <br />0.670.000.000.000.140.000.000.530.200.33U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,141.27840.00033,180.15580.1258169.2717318.01560.00310.5323 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.331784.48810.0063158.73022.5200 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:1.26Crew Hrs:100.00Eff:159.0078UMProd:(Mod) Conc Cure/Protect 4 MenCPC4Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />56.420.14108.500.13SF400.001.00Burlap Cure Blanket3CCBCB <br />108.5586.15110.0048.86MH1.261.00Laborer ForemanLF <br />104.3682.83110.0046.86MH1.261.00Laborer - General G3/4LG <br />LS1.00016030Takeoff Qty: <br />Bid Qty: <br />CONC - SOGBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />131,513.450.000.001,811.255,788.7869,326.615,221.9149,364.9018,300.4331,064.47Total <br />131,513.450.000.001,811.255,788.7869,326.615,221.9149,364.9018,300.4331,064.47U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0089100.355663.1520267.3581491.90000.0020491.9000 <br />SFUnit:650.00Quantity:SOG-FabF Exterior Slab Edge420-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />6,800.630.000.000.005,126.630.000.001,674.00619.161,054.84Total <br />10.460.000.000.007.890.000.002.580.951.62U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />8,370.00620.0013800.00000.8125206.030880.00000.01252.5754 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1.6228103.01540.025040.000016.2500 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:8.13Crew Hrs:100.00Eff:40UMProd:Carpenter Crew - 2 ManC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
The URL can be used to link to this page
Your browser does not support the video tag.