My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 57 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />8,558.06112.98110.0065.01MH75.751.00Oper Dzr->D9/Ex->15MT G3O3 <br />LS1.00016020Takeoff Qty: <br />Bid Qty: <br />CONC - EXT WALL CURBBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />47,242.450.000.00260.556,939.661,852.362,675.6535,514.2313,135.8122,378.42Total <br />47,242.450.000.00260.556,939.661,852.362,675.6535,514.2313,135.8122,378.42U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0117102.987664.8951136.9982344.84000.0029344.8400 <br />SFUnit:976.00Quantity:Gen Conc-Form Curb420-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />30,889.270.000.000.006,883.240.001,708.2422,297.798,241.4714,056.32Total <br />31.650.000.000.007.050.001.7522.858.4414.40U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,754.33490.0055181.81825.3680447.206218.18180.055024.5963 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />14.4020103.84590.22004.5455214.7200 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:4.00Labor Pcs:53.68Crew Hrs:100.00Eff:4.5455UMProd:Carpenter Crew - 4 ManC4Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,883.247.05108.506.50SF976.001.00Wooden Forms Std (SF)3FWS <br />1,708.2431.82109.7530.68HR53.681.00Ford F450 Flatbed8TKJ450 <br />5,708.19106.34110.0061.01MH53.681.00Carpenter ForemanCF <br />16,589.60103.02110.0059.01MH161.043.00Carpenter JourneymanCJ <br />SFUnit:976.00Quantity:Gen Conc-Strip Curb420-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,911.830.000.000.000.000.00776.4710,135.363,746.126,389.24Total <br />11.180.000.000.000.000.000.8010.383.846.55U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,472.06150.0025400.00002.4400447.206140.00000.025011.1802 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />6.5464103.84590.100010.000097.6000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:4.00Labor Pcs:24.40Crew Hrs:100.00Eff:10UMProd:Carpenter Crew - 4 ManC4Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />776.4731.82109.7530.68HR24.401.00Ford F450 Flatbed8TKJ450 <br />2,594.63106.34110.0061.01MH24.401.00Carpenter ForemanCF <br />7,540.73103.02110.0059.01MH73.203.00Carpenter JourneymanCJ <br />CYUnit:9.00Quantity:Gen Conc-Pl Conc Curb420-48Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,172.020.000.00260.550.001,852.36190.942,868.171,067.981,800.19Total <br />574.670.000.0028.950.00205.8221.22318.69118.66200.02U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />8,620.03330.066715.00000.6000509.85171.50000.6667339.9011 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
The URL can be used to link to this page
Your browser does not support the video tag.