My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 62 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />90.753.75100.003.75CY24.201.10WESTERN - 28 M Conc Pump - <br />Yrdage4OP28Y <br />110.0611.01109.7510.21HR10.001.00Walk Behind Compactor8CMWB <br />1,646.25164.63109.75150.00HR10.001.0028 M Conc Pump - OPER8OP28 <br />318.2331.82109.7530.68HR10.001.00Ford F450 Flatbed8TKJ450 <br />1,043.64104.36110.0059.82MH10.001.00Finisher ForemanFF <br />1,010.42101.04110.0057.82MH10.001.00Finisher JourneymanFJ <br />861.5286.15110.0048.86MH10.001.00Laborer ForemanLF <br />2,484.9182.83110.0046.86MH30.003.00Laborer - General G3/4LG <br />SFUnit:980.00Quantity:Gen Conc-Cure Top/Bott Slab Conc420-52Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />411.820.000.000.00138.230.000.00273.59103.23170.36Total <br />0.420.000.000.000.140.000.000.280.110.17U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,042.48810.000111,999.51020.0817334.99451,199.95100.00080.2792 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.173883.66670.0033299.69423.2700 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:4.00Labor Pcs:0.82Crew Hrs:100.00Eff:299.9878UMProd:Conc Cure/Protect 4 MenCPC4Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />138.230.14108.500.13SF980.001.00Burlap Cure Blanket3CCBCB <br />70.6586.16110.0048.86MH0.821.00Laborer ForemanLF <br />202.9482.83110.0046.86MH2.453.00Laborer - General G3/4LG <br />LS1.00016050Takeoff Qty: <br />Bid Qty: <br />CONC - REBARBiditem <br />1.000 LS <br />LSUnit:1.00Quantity:*** REBAR ***401-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />318,400.002.00100.002.00LB159,200.001.00MORSE - *** REBAR - SUB4RB <br />LS1.00016060Takeoff Qty: <br />Bid Qty: <br />PRE-ENGINEERED METAL BUILDING (PEMB)Biditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />422,840.700.000.00140,400.000.00282,440.700.000.000.000.00Total <br />422,840.700.000.00140,400.000.00282,440.700.000.000.000.00U. Cost <br />LSUnit:1.00Quantity:PEMB Purchase513-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />282,440.700.000.000.000.00282,440.700.000.000.000.00Total <br />282,440.700.000.000.000.00282,440.700.000.000.000.00U. Cost <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />313,823.00313,823.00100.00313,823.00LS1.001.00HEARTLAND - Pre-Engineered <br />Metal Building2-PEMB <br />-31,382.30-31,382.30100.00-31,382.30LS1.001.00PEMP Design Calcs Phase 12-PEMBDESIGN
The URL can be used to link to this page
Your browser does not support the video tag.