Page 63 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />LSUnit:1.00Quantity:PEMB Install (SUB)513-05Activity:
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />140,400.00140,400.00100.00140,400.00LS1.001.00HEARTLAND - SUB - PEMB
<br />Install4PEMB
<br />LS1.00016070Takeoff Qty:
<br />Bid Qty:
<br />PEMB - EXTERIOR FINISHESBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />69,361.850.000.000.000.0057,000.000.0012,361.854,572.237,789.62Total
<br />69,361.850.000.000.000.0057,000.000.0012,361.854,572.237,789.62U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0167103.015464.9135578.0154120.00000.0083120.0000
<br />EAUnit:5.00Quantity:Furn/Install Steel Doors and Hardware513-10Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />62,801.540.000.000.000.0052,500.000.0010,301.543,810.196,491.35Total
<br />12,560.310.000.000.000.0010,500.000.002,060.31762.041,298.27U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />12,560.30801.00001.00005.0000206.03080.100010.00002,060.3080
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,298.2700103.015420.00000.0500100.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.00Equipment Pcs:2.00Labor Pcs:50.00Crew Hrs:100.00Eff:10HUProd:Carpenter Crew - 2 ManC2Crew:
<br />Access Control Plug from a quote COE provided from a different projectNotes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />35,000.0035,000.00100.0035,000.00EST1.001.00Access Control SUB2ACCSUB
<br />17,500.003,500.00100.003,500.00EA5.001.00Steel Man Door - Frame &
<br />Panel2SMANDOOR
<br />10,301.54103.02110.0059.01MH100.002.00Carpenter JourneymanCJ
<br />LSUnit:1.00Quantity:Site and Bldg. Signage405-00Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />6,560.310.000.000.000.004,500.000.002,060.31762.041,298.27Total
<br />6,560.310.000.000.000.004,500.000.002,060.31762.041,298.27U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />6,560.31001.00001.00001.0000206.03100.100010.00002,060.3100
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,298.2700103.015520.00000.050020.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:10CHProd:Carpenter Crew - 2 ManC2Crew:
<br />includes budget for:
<br />Striping
<br />Handicap Signage and painting
<br />Chen Building / door names
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />4,500.004,500.00100.004,500.00LS1.001.00Site and Bldg. Signage2SIGN
<br />2,060.31103.02110.0059.01MH20.002.00Carpenter JourneymanCJ
|