My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 64 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00016080Takeoff Qty: <br />Bid Qty: <br />PEMB - INTERIOR FINISHESBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />196,259.920.000.0055,893.000.0097,925.002,796.4339,645.4914,672.2924,973.20Total <br />196,259.920.000.0055,893.000.0097,925.002,796.4339,645.4914,672.2924,973.20U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0072102.310964.4470506.4772387.50000.0026387.5000 <br />LFUnit:100.00Quantity:Alum. Hand Rail400-38Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />17,150.780.000.000.000.0012,000.000.005,150.781,905.103,245.68Total <br />171.510.000.000.000.00120.000.0051.5119.0532.46U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,860.31200.025040.00002.5000206.03124.00000.250051.5078 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />32.4568103.01560.50002.000050.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:25.00Crew Hrs:100.00Eff:25CHProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />12,000.00120.00100.00120.00LF100.001.00Alum. Handrail2HANDR <br />5,150.78103.02110.0059.01MH50.002.00Carpenter JourneymanCJ <br />EAUnit:5.00Quantity:Furn/Install - Fire Extinguishers405-03Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,272.610.000.000.000.00500.000.00772.61285.76486.85Total <br />254.520.000.000.000.00100.000.00154.5257.1597.37U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,393.62670.075013.33330.3750206.02931.33330.7500154.5220 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />97.3700103.01471.50000.66677.5000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:3.75Crew Hrs:100.00Eff:0.75HUProd:Carpenter Crew - 2 ManC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />500.00500.00100.00500.00LS1.001.00Fire Protection Specialites2FP <br />772.61103.01110.0059.01MH7.502.00Carpenter JourneymanCJ <br />LSUnit:1.00Quantity:Finishes and Accessories405-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />11,277.230.000.000.000.005,500.000.005,777.232,149.773,627.46Total <br />11,277.230.000.000.000.005,500.000.005,777.232,149.773,627.46U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,638.61502.00000.50002.0000288.86150.050020.00005,777.2300 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,627.460096.287260.00000.016760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:(Mod) Carpenter Crew - 2 ManC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
The URL can be used to link to this page
Your browser does not support the video tag.