Laserfiche WebLink
Page 4 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />14,534.8512.86109.7530.68HR1,130.001.00→ Ford F450 Flatbed %08TKJ450 <br />25,519.6012.86109.7530.68HR1,984.001.00→ Ford F450 Pipefitter %08TKJ450P <br />LS1.00010070Takeoff Qty: <br />Bid Qty: <br />** TRAVEL/LIVING EXPENSES **Biditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />123,760.000.00123,760.000.000.000.000.000.000.000.00Total <br />123,760.000.00123,760.000.000.000.000.000.000.000.00U. Cost <br />MNDYUnit:78.00Quantity:Hotel Costs017-10Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />*** Cost of hotel rooms for personnel traveling to/from job. ***Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />9,360.00120.00100.00120.00MNDY78.001.00Hotel Room91601 <br />MOUnit:18.00Quantity:Crew Housing Costs017-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />114,400.000.00114,400.000.000.000.000.000.000.000.00Total <br />6,355.560.006,355.560.000.000.000.000.000.000.00U. Cost <br />WA Road ConstructionWA0101WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />*** Costs for crew houses including associated utilities and house furnishings. ***Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />90,000.002,500.00100.002,500.00EAMO36.002.00Temporary Housing91602 <br />10,000.0010,000.00100.0010,000.00EA1.002.00Temp Housing Furnishings91603 <br />14,400.00400.00100.00400.00EAMO36.002.00Temp Housing Utillities91604 <br />LS1.00010080Takeoff Qty: <br />Bid Qty: <br />** PROJECT SAFETY **Biditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />51,568.560.002,000.000.000.000.000.0049,568.5617,581.9631,986.60Total <br />51,568.560.002,000.000.000.000.000.0049,568.5617,581.9631,986.60U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.003195.324261.512799.1703520.00000.0019520.0000 <br />HRUnit:400.00Quantity:Safety Training018-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />38,582.730.000.000.000.000.000.0038,582.7313,677.6124,905.12Total <br />96.460.000.000.000.000.000.0096.4634.1962.26U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />1,929.13650.050020.000020.0000192.91372.00000.500096.4568 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />62.262896.45681.00001.0000400.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:200.00Crew Hrs:100.00Eff:1MUProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />*** Include trainer certification fees and labor costs for job specific safety training. ***Notes: