Laserfiche WebLink
Page 5 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />18,309.7191.55100.0059.01MH200.001.00Carpenter JourneymanCJ <br />20,273.02101.37100.0065.51MH200.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:20.00Quantity:Drug Testing018-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />12,985.830.002,000.000.000.000.000.0010,985.833,904.357,081.48Total <br />649.290.00100.000.000.000.000.00549.29195.22354.07U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />1,082.15250.60001.666712.000091.54860.16676.0000549.2915 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />354.074091.54866.00000.1667120.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />0.00Equipment Pcs:1.00Labor Pcs:120.00Crew Hrs:100.00Eff:6HUProd:Carpenter Crew - 1 ManC1Crew: <br />*** Include labor costs for drug testing if appropriate. ***Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,000.00100.00100.00100.00EA20.001.00Drug Testing91702 <br />10,985.8391.55100.0059.01MH120.001.00Carpenter JourneymanCJ <br />LS1.00010090Takeoff Qty: <br />Bid Qty: <br />** GENERAL PROJ FACILITIES/TOOLS **Biditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,000.000.0010,000.000.000.000.000.000.000.000.00Total <br />10,000.000.0010,000.000.000.000.000.000.000.000.00U. Cost <br />CYUnit:500.00Quantity:Eco Pans019-30Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:40 Hour Week - (4@10)410Calendar: <br />*** Rental of eco pans and disposal of concrete & slurry materials. Based on total volume of concrete puchased for project. <br />***Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,000.0020.00100.0020.00CY500.001.00Eco Pans91806 <br />LS1.00010100Takeoff Qty: <br />Bid Qty: <br />** ENGINEER/SURVEY/BIM SERVICES **Biditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />192,778.920.000.000.000.000.0080,446.75112,332.1716,149.7796,182.40Total <br />192,778.920.000.000.000.000.0080,446.75112,332.1716,149.7796,182.40U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.000381.636869.9000140.10101,376.00000.00071,376.0000 <br />DAYUnit:40.00Quantity:BIM Modeling020-25Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />36,164.610.000.000.000.000.0010,040.8526,123.763,755.7622,368.00Total <br />904.120.000.000.000.000.00251.02653.0993.89559.20U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />1,130.14410.80001.250032.0000113.01440.12508.0000904.1153