Page 70 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />2,328.5020122.197330.00000.0333150.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />2.00Equipment Pcs:3.00Labor Pcs:50.00Crew Hrs:100.00Eff:10HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />7,500.007,500.00100.007,500.00LS1.001.00Compressed Air Materials2COMPAIRMAT
<br />1,997.4539.95109.7536.40HR50.001.00Scissor Lift 20' Elec OSR8MLS20
<br />1,591.1431.82109.7530.68HR50.001.00Ford F450 Pipefitter8TKJ450P
<br />6,220.60124.41110.0071.89MH50.001.00Pipefitter ForemanPFF
<br />12,108.99121.09110.0069.89MH100.002.00Pipefitter JourneymanPFJ
<br />LS1.00016180Takeoff Qty:
<br />Bid Qty:
<br />HVAC & ELECTRICALBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />1,449,264.280.000.001,442,612.020.000.001,079.495,572.772,080.713,492.06Total
<br />1,449,264.280.000.001,442,612.020.000.001,079.495,572.772,080.713,492.06U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.050092.879558.201024,154.404760.00000.016760.0000
<br />LSUnit:1.00Quantity:Electrical - I&C and HVAC906-00Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />1,449,264.280.000.001,442,612.020.000.001,079.495,572.772,080.713,492.06Total
<br />1,449,264.280.000.001,442,612.020.000.001,079.495,572.772,080.713,492.06U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />724,632.14002.00000.50002.0000332.61300.050020.00006,652.2600
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />3,492.060092.879560.00000.016760.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:Utility Crew X135T/3 MenPCUX3Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />764,612.02764,612.02100.00764,612.02LS1.001.00SERVICE - Electrical Sub4EL
<br />222,100.00222,100.00100.00222,100.00LS1.001.00SHINN - HVAC Sub4HVAC
<br />263,700.00263,700.00100.00263,700.00LS1.001.00QCC - I&C Sub4I&C
<br />192,200.00192,200.00100.00192,200.00LS1.001.00SHINN - Plumbing Sub4PLUMB
<br />1,079.4953.97109.7549.58HR20.001.00Takeuchi 135 Excvatr 3.5MT8EX135T
<br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG
<br />2,259.55112.98110.0065.01MH20.001.00Oper Dzr->D9/Ex->15MT G3O3
<br />LS1.00017000Takeoff Qty:
<br />Bid Qty:
<br />CFDS VALVE REPLACEMENTSBiditem - Parent
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />307,792.401,968.750.00103,054.1621,851.9036,224.4551,290.2093,402.9433,951.7759,451.17Total
<br />307,792.401,968.750.00103,054.1621,851.9036,224.4551,290.2093,402.9433,951.7759,451.17U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0000102.386365.1691337.3955912.26000.0011912.2600
<br />SHORING - TRENCH BOXBiditem
|