Page 71 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />LS1.00017015Takeoff Qty:
<br />Bid Qty:1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />27,335.090.000.000.0016,275.000.003,543.757,516.342,803.324,713.02Total
<br />27,335.090.000.000.0016,275.000.003,543.757,516.342,803.324,713.02U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.050093.954358.9128341.688680.00000.012580.0000
<br />MOUnit:1.00Quantity:Shoring Box Rental930-02Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />27,335.090.000.000.0016,275.000.003,543.757,516.342,803.324,713.02Total
<br />27,335.090.000.000.0016,275.000.003,543.757,516.342,803.324,713.02U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />13,667.54502.00000.50002.0000553.00450.050020.000011,060.0900
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />4,713.020093.954380.00000.012580.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:4.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:(Mod) Excav X470/2 MenE472Crew:
<br />at least two boxes, custom spreaders, and 3-4 road plates required = 3 pcs...
<br />Building and tear down of boxes included here.
<br />Installation and Removal included in excavation items
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />16,275.005,425.00108.505,000.00MO3.003.00Shoring Rental3SH
<br />3,543.75177.19109.75165.00HR20.001.00JD 470 Excavator 50MT8EX470
<br />5,220.6187.01110.0049.38MH60.003.00Laborer - Grade Checker G4LGC
<br />2,295.73114.79110.0066.10MH20.001.00Oper Ldr->8 CY/Ex->50MT G1O1
<br />LS1.00017020Takeoff Qty:
<br />Bid Qty:
<br />DEWATERINGBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />88,840.030.000.0083,946.160.000.001,881.523,012.351,116.671,895.68Total
<br />88,840.030.000.0083,946.160.000.001,881.523,012.351,116.671,895.68U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0074100.411763.18932,961.334330.00000.033330.0000
<br />EAUnit:5.00Quantity:Dewatering Sub Support655-97Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />4,893.870.000.000.000.000.001,881.523,012.351,116.671,895.68Total
<br />978.770.000.000.000.000.00376.30602.47223.33379.14U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />3,262.58000.30003.33331.5000326.25800.33333.0000978.7740
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />379.1360100.41176.00000.166730.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:2.00Labor Pcs:15.00Crew Hrs:100.00Eff:3HUProd:(Mod) Excav X200/2 MenE202Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
|