Laserfiche WebLink
Page 78 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />8,482.60000.0067150.00000.2000326.260015.00000.066721.7507 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />8.4253100.41250.13337.50004.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:2.00Crew Hrs:100.00Eff:15UHProd:Excav X200/2 MenE202Crew: <br />Work area under and around pipesNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,044.0034.80100.0034.80TON30.001.00HEIDLBRGMAT - Quarry Spalls <br />FOB Job2AJSRS <br />250.87125.44109.75115.48HR2.001.00JD 200 Excavator 20MT8EX200 <br />174.0287.01110.0049.38MH2.001.00Laborer - Grade Checker G4LGC <br />227.63113.82110.0065.51MH2.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />SFUnit:100.00Quantity:Fine Grading296-08Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,328.720.000.000.000.00349.95376.30602.47223.34379.13Total <br />13.290.000.000.000.003.503.766.022.233.79U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,429.06670.0030333.33330.3000326.256733.33330.03009.7877 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3.7913100.41170.060016.66676.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:3.00Crew Hrs:100.00Eff:33.3333UHProd:Excav X200/2 MenE202Crew: <br />Level work areas for ladders / scaffolding - welding and fitting supportNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />349.9523.33100.0023.33TON15.001.00LAKESIDE - Cr Surf Top Course <br />FOB Job2AJCSTC <br />376.30125.43109.75115.48HR3.001.00JD 200 Excavator 20MT8EX200 <br />261.0387.01110.0049.38MH3.001.00Laborer - Grade Checker G4LGC <br />341.44113.81110.0065.51MH3.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00017120Takeoff Qty: <br />Bid Qty: <br />BACKFILL AND RESTORATIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />28,636.870.000.000.000.0010,564.008,259.349,813.533,467.916,345.62Total <br />28,636.870.000.000.000.0010,564.008,259.349,813.533,467.916,345.62U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0281103.365666.8382301.631294.94000.010594.9400 <br />TONUnit:712.00Quantity:Grav Borrow - Purch FOB Job231-15Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />Cut proposed volume into 1/2 purchase import - assuming 1/2 native - waste remaing native onsiteNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,764.0019.00100.0019.00TON356.000.50GIRARD - Gravel Borrow FOB <br />Job2AJBGB <br />TNUnit:200.00Quantity:Pipe Bedding - Purch FOB Job231-16Activity: <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit