Page 77 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />LS1.00017090Takeoff Qty:
<br />Bid Qty:1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />11,449.170.000.000.001,898.751,393.953,135.875,020.601,861.133,159.47Total
<br />11,449.170.000.000.001,898.751,393.953,135.875,020.601,861.133,159.47U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0400100.412063.1894228.983450.00000.020050.0000
<br />EAUnit:2.00Quantity:Local Dewatering / Sumping296-02Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />4,076.340.000.000.00813.750.001,254.352,008.24744.451,263.79Total
<br />2,038.170.000.000.00406.880.00627.181,004.12372.23631.90U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,076.34000.50002.00001.0000326.25900.20005.00001,631.2950
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />631.8950100.412010.00000.100020.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:5HUProd:Excav X200/2 MenE202Crew:
<br />CMA for sumps, pumps, hoses, discharge piping, etc.Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />813.751.09108.501.00DOL750.001.00Consumable Matl Allowance3CMA
<br />1,254.35125.44109.75115.48HR10.001.00JD 200 Excavator 20MT8EX200
<br />870.1087.01110.0049.38MH10.001.00Laborer - Grade Checker G4LGC
<br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />LSUnit:1.00Quantity:Temporary Pipe Support296-04Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />4,347.590.000.000.001,085.000.001,254.352,008.24744.451,263.79Total
<br />4,347.590.000.000.001,085.000.001,254.352,008.24744.451,263.79U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,347.59001.00001.00001.0000326.25900.100010.00003,262.5900
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,263.7900100.412020.00000.050020.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:Excav X200/2 MenE202Crew:
<br />Assumption:
<br />Ecology Blocks, Wedges / blocking, bridging, metal strapping, etc.
<br />30" Backwash
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,085.001.09108.501.00DOL1,000.001.00Consumable Matl Allowance3CMA
<br />1,254.35125.44109.75115.48HR10.001.00JD 200 Excavator 20MT8EX200
<br />870.1087.01110.0049.38MH10.001.00Laborer - Grade Checker G4LGC
<br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />TNUnit:30.00Quantity:Subgrade Stabilization296-06Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />1,696.520.000.000.000.001,044.00250.87401.65148.89252.76Total
<br />56.550.000.000.000.0034.808.3613.394.968.43U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
|