My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 82 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />CMA - Misc. disinfection items / equipment - may or may not be provided by CityNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />500.001.00100.001.00DOL500.001.00Perm Matl Allowance2CMA <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:1.00Quantity:PI - Install new sample quil660-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,580.420.000.002,500.000.00200.00539.742,340.68856.741,483.94Total <br />5,580.420.000.002,500.000.00200.00539.742,340.68856.741,483.94U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,580.42001.00001.00001.0000288.04200.100010.00002,880.4200 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,483.9400117.034020.00000.050020.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />200.002.00100.002.00LF100.001.002" PVC Pipe2PIPV02 <br />2,500.002,500.00100.002,500.00EA1.001.00SUB - Pipe Welding4WELD <br />539.7453.97109.7549.58HR10.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />1,129.78112.98110.0065.01MH10.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />1,210.90121.09110.0069.89MH10.001.00Pipefitter JourneymanPFJ <br />EAUnit:4.00Quantity:PI - CFDS Injection Lines660-22Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />26,921.670.000.000.000.0015,400.002,158.979,362.703,426.925,935.78Total <br />6,730.420.000.000.000.003,850.00539.742,340.68856.731,483.95U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,730.41751.00001.00004.0000288.04180.100010.00002,880.4175 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,483.9450117.033820.00000.050080.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:40.00Crew Hrs:100.00Eff:10HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew: <br />Work OUTSIDE of structure: <br />Replace / modify 4 injection lines into the CFDS to allow for future cleaning???? could mean bring pipes to just under lid <br />and new wall penetrations for future removal? <br />CMA - Coring, Link Seals, Supports, Covers, Insulation, etc. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />15,000.001.00100.001.00DOL15,000.001.00Perm Matl Allowance2CMA <br />400.002.00100.002.00LF200.001.002" PVC Pipe2PIPV02 <br />2,158.9753.97109.7549.58HR40.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />4,519.10112.98110.0065.01MH40.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />4,843.60121.09110.0069.89MH40.001.00Pipefitter JourneymanPFJ <br />EAUnit:2.00Quantity:PI - Cathodic Protection Jumpers660-30Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
The URL can be used to link to this page
Your browser does not support the video tag.