Laserfiche WebLink
Page 83 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />2,440.210.000.000.000.001,000.00269.871,170.34428.36741.98Total <br />1,220.110.000.000.000.00500.00134.94585.17214.18370.99U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,880.42000.25004.00000.5000288.04200.40002.5000720.1050 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />370.9900117.03405.00000.200010.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:5.00Crew Hrs:100.00Eff:2.5HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,000.00500.00100.00500.00EA2.001.00Cathodic Protection2CP <br />269.8753.97109.7549.58HR5.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />564.89112.98110.0065.01MH5.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />605.45121.09110.0069.89MH5.001.00Pipefitter JourneymanPFJ <br />LS1.00017140Takeoff Qty: <br />Bid Qty: <br />ELECTRICALBiditem <br />1.000 LS <br />LS1.00018000Takeoff Qty: <br />Bid Qty: <br />CFDS SLIDE GATESBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />373,958.690.000.00128,292.0216,817.5036,000.0045,507.31147,341.8654,786.9592,554.91Total <br />373,958.690.000.00128,292.0216,817.5036,000.0045,507.31147,341.8654,786.9592,554.91U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.002397.063160.9716246.34961,518.00000.00071,518.0000 <br />EAUnit:2.00Quantity:SG - Diving to Seal Valves797-02Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />24,645.020.000.0018,500.000.000.00555.535,589.492,086.363,503.13Total <br />12,322.510.000.009,250.000.000.00277.772,794.751,043.181,751.57U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />12,322.51001.00001.00002.0000307.25100.100010.00003,072.5100 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,751.565093.158230.00000.033360.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />One shift to install / plug, second shift to remove and cleanupNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />18,500.009,250.00100.009,250.00DAY2.001.00CRUX - SUB - Diving Sub4DIVING <br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08 <br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG <br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LSUnit:1.00Quantity:Drain Structure797-04Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor