Page 90 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />29,544.880.000.000.002,712.500.001,909.3624,923.029,211.7715,711.25Total
<br />9,848.290.000.000.00904.170.00636.458,307.673,070.595,237.08U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,924.14672.00000.50006.0000447.20630.050020.00008,944.1267
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />5,237.0833103.845980.00000.0125240.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:4.00Labor Pcs:60.00Crew Hrs:100.00Eff:20HUProd:Carpenter Crew - 4 ManC4Crew:
<br />CMA - Demo materials to support in removal of large existing gatesNotes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />2,712.501.09108.501.00DOL2,500.001.00Consumable Matl Allowance3CMA
<br />1,909.3631.82109.7530.68HR60.001.00Ford F450 Flatbed8TKJ450
<br />6,380.24106.34110.0061.01MH60.001.00Carpenter ForemanCF
<br />18,542.78103.02110.0059.01MH180.003.00Carpenter JourneymanCJ
<br />EAUnit:3.00Quantity:Assemble and Install Gates797-12Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />112,221.970.000.000.000.000.0034,960.7677,261.2128,774.8248,486.39Total
<br />37,407.320.000.000.000.000.0011,653.5925,753.749,591.6116,162.13U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />6,234.55396.00000.166718.0000623.45540.016760.000037,407.3233
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />16,162.130095.3842270.00000.0037810.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.50Equipment Pcs:4.50Labor Pcs:180.00Crew Hrs:100.00Eff:60HUProd:(Mod) Hoist RT600/3 MenHOC53Crew:
<br />Assembly and install to include:
<br />Assemble gate pieces
<br />build anchor bolt template
<br />core / drill anchor bolts
<br />epoxy anchor bolts
<br />install gate frame
<br />form behind gate
<br />epoxy grout gate to wall connection
<br />strip forms
<br />install operator shaft
<br />install bearings
<br />install pedestal
<br />install operators
<br />etc...
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />34,960.76388.45109.75358.34HR90.000.50Grove RT880E 80 Ton8CRRG8
<br />37,085.55103.02110.0059.01MH360.002.00Carpenter JourneymanCJ
<br />29,818.9782.83110.0046.86MH360.002.00Laborer - General G3/4LG
<br />10,356.69115.07110.0066.27MH90.000.50Oper Crane <100T G1OC1
<br />LSUnit:1.00Quantity:Repair CMU wall797-15Activity:
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />15,000.0015,000.00100.0015,000.00LS1.001.00CMU Sub4CMUSUB
<br />LSUnit:1.00Quantity:Disinfect Structure797-20Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />4,072.520.000.000.000.001,000.00277.772,794.751,043.181,751.57Total
<br />4,072.520.000.000.000.001,000.00277.772,794.751,043.181,751.57U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
|