My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 89 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />10,218.88001.00001.00001.0000316.63800.100010.00003,166.3800 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,813.730096.287030.00000.033330.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />CMA - Anchors, Wedges, Grout, Supports while cutting, etc.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,627.501.09108.501.00DOL1,500.001.00Consumable Matl Allowance3CMA <br />5,425.005,425.00108.505,000.00EA1.001.00Steel Wall Support Framing3STFRAMING <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />2,060.31103.02110.0059.01MH20.002.00Carpenter JourneymanCJ <br />828.3082.83110.0046.86MH10.001.00Laborer - General G3/4LG <br />LSUnit:1.00Quantity:Wall Demo797-08Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,396.550.000.00144.000.000.00565.782,686.771,006.711,680.06Total <br />3,396.550.000.00144.000.000.00565.782,686.771,006.711,680.06U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,396.55001.00001.00001.0000325.25500.100010.00003,252.5500 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,680.060089.559030.00000.033330.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Demo Dental 185/PB/2 MenDMD2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />144.000.60100.000.60INFT240.001.00Saw Cut - Conc4SCC <br />497.1949.72109.7545.99HR10.001.00185 CFM Compressor8AC185 <br />68.593.43109.753.13HR20.002.00Jack Hammer/Rock Drill8MSJH <br />1,030.16103.02110.0059.01MH10.001.00Carpenter JourneymanCJ <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />EAUnit:3.00Quantity:Temporary Hoisting Equipment797-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />23,140.050.000.000.0010,850.000.001,111.0611,178.994,172.727,006.27Total <br />7,713.350.000.000.003,616.670.00370.353,726.331,390.912,335.42U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,785.01251.33330.75004.0000307.25130.075013.33334,096.6833 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,335.423393.158340.00000.0250120.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:13.3333HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,850.0010,850.00108.5010,000.00LS1.001.00Hoisting Items3HOIST <br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08 <br />6,626.4482.83110.0046.86MH80.002.00Laborer - General G3/4LG <br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:3.00Quantity:Remove old gates797-11Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
The URL can be used to link to this page
Your browser does not support the video tag.