Page 92 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />9,040.02001.00001.00001.0000307.25200.100010.00003,072.5200
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,751.570093.158330.00000.033330.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew:
<br />CMA covers misc discharge piping and fuel for initial drawdown.Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />2,712.501.09108.501.00DOL2,500.001.00Consumable Matl Allowance3CMA
<br />3,255.001,627.50108.501,500.00EA2.001.00Pumping Equipment3PUMP
<br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08
<br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG
<br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />EAUnit:1.00Quantity:Remove exisitng access hatch797-07Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />2,068.140.000.000.000.000.001,165.36902.78334.70568.08Total
<br />2,068.140.000.000.000.000.001,165.36902.78334.70568.08U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />6,893.80000.30003.33330.3000689.38000.33333.00002,068.1400
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />568.0800100.30899.00000.11119.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:3.00Crew Hrs:100.00Eff:3HUProd:Hoist RT600/3 MenHOC53Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,165.36388.45109.75358.34HR3.001.00Grove RT880E 80 Ton8CRRG8
<br />309.05103.02110.0059.01MH3.001.00Carpenter JourneymanCJ
<br />248.5082.83110.0046.86MH3.001.00Laborer - General G3/4LG
<br />345.23115.08110.0066.27MH3.001.00Oper Crane <100T G1OC1
<br />EAUnit:3.00Quantity:Temporary Hoisting Equipment797-10Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />23,140.050.000.000.0010,850.000.001,111.0611,178.994,172.727,006.27Total
<br />7,713.350.000.000.003,616.670.00370.353,726.331,390.912,335.42U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />5,785.01251.33330.75004.0000307.25130.075013.33334,096.6833
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />2,335.423393.158340.00000.0250120.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:13.3333HUProd:(Mod) Pipe FL/3 MenPCF3Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />10,850.0010,850.00108.5010,000.00LS1.001.00Hoisting Items3HOIST
<br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08
<br />6,626.4482.83110.0046.86MH80.002.00Laborer - General G3/4LG
<br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />EAUnit:3.00Quantity:Remove old gates797-11Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />29,544.880.000.000.002,712.500.001,909.3624,923.029,211.7715,711.25Total
<br />9,848.290.000.000.00904.170.00636.458,307.673,070.595,237.08U. Cost
|