Laserfiche WebLink
Page 93 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,924.14672.00000.50006.0000447.20630.050020.00008,944.1267 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5,237.0833103.845980.00000.0125240.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:4.00Labor Pcs:60.00Crew Hrs:100.00Eff:20HUProd:Carpenter Crew - 4 ManC4Crew: <br />CMA - Demo materials to support in removal of large existing gatesNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,712.501.09108.501.00DOL2,500.001.00Consumable Matl Allowance3CMA <br />1,909.3631.82109.7530.68HR60.001.00Ford F450 Flatbed8TKJ450 <br />6,380.24106.34110.0061.01MH60.001.00Carpenter ForemanCF <br />18,542.78103.02110.0059.01MH180.003.00Carpenter JourneymanCJ <br />EAUnit:3.00Quantity:Assemble and Install Gates797-12Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />112,221.970.000.000.000.000.0034,960.7677,261.2128,774.8248,486.39Total <br />37,407.320.000.000.000.000.0011,653.5925,753.749,591.6116,162.13U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,234.55396.00000.166718.0000623.45540.016760.000037,407.3233 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />16,162.130095.3842270.00000.0037810.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.50Equipment Pcs:4.50Labor Pcs:180.00Crew Hrs:100.00Eff:60HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Assembly and install to include: <br />Assemble gate pieces <br />build anchor bolt template <br />core / drill anchor bolts <br />epoxy anchor bolts <br />install gate frame <br />form behind gate <br />epoxy grout gate to wall connection <br />strip forms <br />install operator shaft <br />install bearings <br />install pedestal <br />install operators <br />etc... <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />34,960.76388.45109.75358.34HR90.000.50Grove RT880E 80 Ton8CRRG8 <br />37,085.55103.02110.0059.01MH360.002.00Carpenter JourneymanCJ <br />29,818.9782.83110.0046.86MH360.002.00Laborer - General G3/4LG <br />10,356.69115.07110.0066.27MH90.000.50Oper Crane <100T G1OC1 <br />EAUnit:1.00Quantity:FRP Curbs797-14Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,241.230.000.000.000.002,000.000.008,241.233,048.155,193.08Total <br />10,241.230.000.000.000.002,000.000.008,241.233,048.155,193.08U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,560.30754.00000.25004.0000206.03080.025040.00008,241.2300 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5,193.0800103.015480.00000.012580.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:40.00Crew Hrs:100.00Eff:40HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />Perm Allowance includes: <br />Forms <br />Rebar <br />Epoxy <br />Waterstop <br />Notes: