Laserfiche WebLink
Page 95 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,000.001.00100.001.00DOL1,000.001.00Perm Matl Allowance2CMA <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00021000Takeoff Qty: <br />Bid Qty: <br />BYPASS SYSTEMSBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,136,559.880.000.0035,000.0052,080.00787,731.5078,665.03183,083.3566,294.89116,788.46Total <br />1,136,559.880.000.0035,000.0052,080.00787,731.5078,665.03183,083.3566,294.89116,788.46U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0022108.978269.5169676.52371,680.00000.00061,680.0000 <br />LSUnit:1.00Quantity:Bypass Purchase649-35Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />745,000.00745,000.00100.00745,000.00LS1.001.00FERGUSON - Bypass Materials <br />Purchase2PIBYPASS <br />LFUnit:500.00Quantity:Wat Main - 30" HDPE649-36Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />75,923.930.000.000.0016,275.009,681.9525,064.2424,902.748,764.0116,138.73Total <br />151.850.000.000.0032.5519.3650.1349.8117.5332.28U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />15,184.78600.0100100.00005.0000999.339610.00000.100099.9340 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />32.277599.61100.50002.0000250.0000 <br />WA PipelayingWA0107WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />11.00Equipment Pcs:5.00Labor Pcs:50.00Crew Hrs:100.00Eff:10UHProd:(Mod) Pipe X330/X225/HP/L644/5 MenPC3305Crew: <br />estimate 20 welds @ 2.5 hrs / weld (layout, string, face, heat, fuse, cool, move) = 50 hrsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />9,681.9523.33100.0023.33TON415.001.00LAKESIDE - Gvl BF Pipe Zone <br />Bed FOB Job2AJGPZ <br />16,275.008,137.50108.507,500.00WK2.001.00FERGUSON - Fusion Machine 24 <br />to 36"3FM2436 <br />926.0218.52109.7516.88HR50.001.00Hoe Pack Excavator Mount8CMHP <br />6,271.74125.43109.75115.48HR50.001.00JD 200 Excavator 20MT8EX200 <br />8,759.04175.18109.75161.48HR50.001.00JD 330 Excavator 33MT8EX330 <br />1,388.8327.78109.7526.38HR50.001.00Genie 842 Forklift 8K 42'8FL08 <br />4,892.7897.86109.7590.74HR50.001.00JD 644 Loader 4.5 CY8LD644 <br />548.752.74109.752.50HR200.004.00Road Plate8SHRP <br />685.9413.72109.7512.50HR50.001.00Trench Box 8'H8SHT <br />1,591.1431.82109.7530.68HR50.001.00Ford F450 Pipefitter8TKJ450P <br />7,996.7579.97110.0046.86MH100.002.00Laborer - General G3/4LG <br />5,596.18111.92110.0066.10MH50.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />5,547.53110.95110.0065.51MH50.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />5,762.28115.25110.0068.10MH50.001.00Operator ForemanOF <br />EAUnit:1.00Quantity:Wat Main - 30" Tie In649-37Activity: