Laserfiche WebLink
Page 96 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,814.800.000.0010,000.000.001,000.00817.513,997.291,482.432,514.86Total <br />15,814.800.000.0010,000.000.001,000.00817.513,997.291,482.432,514.86U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />15,814.80001.00001.00001.0000481.48000.100010.00004,814.8000 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,514.860099.932340.00000.025040.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:4.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew: <br />CMA = Shims, Filler pieces, backing rings, taps, etc.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,000.001.00100.001.00DOL1,000.001.00Perm Matl Allowance2CMA <br />10,000.005,000.00100.005,000.00EA2.001.00SUB - Pipe Welding4WELD <br />539.7453.97109.7549.58HR10.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,129.78112.98110.0065.01MH10.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />1,210.90121.09110.0069.89MH10.001.00Pipefitter JourneymanPFJ <br />LFUnit:480.00Quantity:Wat Main - 63" HDPE649-39Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />108,650.490.000.000.0032,550.0011,049.5532,179.3332,871.6111,568.4921,303.12Total <br />226.360.000.000.0067.8123.0267.0468.4824.1044.38U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />16,462.19550.013872.72736.6000985.62037.27270.1375135.5228 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />44.381599.61090.68751.4545330.0000 <br />WA PipelayingWA0107WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />10.00Equipment Pcs:5.00Labor Pcs:66.00Crew Hrs:100.00Eff:7.2727UHProd:(Mod) Pipe X330/X225/HP/L644/5 MenPC3305Crew: <br />estimate 22 welds @ 3 hrs / weld (layout, string, face, heat, fuse, cool, move) = 66 hrsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />11,049.5523.33100.0023.33TON473.621.00LAKESIDE - Gvl BF Pipe Zone <br />Bed FOB Job2AJGPZ <br />32,550.0016,275.00108.5015,000.00WK2.001.00FERGUSON - Fusion Machine 42 <br />to 72"3FM4272 <br />1,222.3418.52109.7516.88HR66.001.00Hoe Pack Excavator Mount8CMHP <br />8,278.69125.43109.75115.48HR66.001.00JD 200 Excavator 20MT8EX200 <br />11,561.93175.18109.75161.48HR66.001.00JD 330 Excavator 33MT8EX330 <br />1,833.2527.78109.7526.38HR66.001.00Genie 842 Forklift 8K 42'8FL08 <br />6,458.4797.86109.7590.74HR66.001.00JD 644 Loader 4.5 CY8LD644 <br />724.352.74109.752.50HR264.004.00Road Plate8SHRP <br />2,100.3031.82109.7530.68HR66.001.00Ford F450 Pipefitter8TKJ450P <br />10,555.7179.97110.0046.86MH132.002.00Laborer - General G3/4LG <br />7,386.95111.92110.0066.10MH66.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />7,322.75110.95110.0065.51MH66.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />7,606.20115.25110.0068.10MH66.001.00Operator ForemanOF <br />EAUnit:5.00Quantity:Filter Gallery Mechanical720-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />98,928.660.000.0025,000.000.0010,000.008,939.8954,988.7720,061.2434,927.53Total <br />19,785.730.000.005,000.000.002,000.001,787.9810,997.754,012.256,985.51U. Cost