My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/01 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 11:26:32 AM
Creation date
5/1/2024 6:21:51 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> <br /> <br />PROFESSIONAL SERVICES AGREEMENT <br /> <br />This Professional Services Agreement (“Agreement”) is effective as of the date of the <br />Mayor’s signature below and is between the City of Everett, a Washington municipal corporation <br />(the “City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). <br />This Agreement is for the purpose of the Service Provider providing services to the City as set <br />forth in the Agreement. This Agreement includes and incorporates the Basic Provisions, the <br />attached General Provisions, the attached scope of work (Exhibit A), and the attached method of <br />compensation (Exhibit B). <br />BASIC PROVISIONS <br />Service Provider <br />HDR Engineering, Inc. <br />929 108th Ave, Suite 1300 <br />Bellevue, WA 98001 <br />Cindy.kinzer@hdrinc.com <br />City Project <br />Manager <br />Erik Emerson <br />City of Everett – Public Works <br /> <br />3200 Cedar Street <br />Everett, WA 98201 <br />eemerson@everettwa.gov <br />Brief Summary of <br />Scope of Work Lexington-Broadway Stormwater Improvements-Phase 1 <br />Completion Date December 31, 2025 <br />Maximum <br />Compensation <br />Amount <br />$877,460 <br />
The URL can be used to link to this page
Your browser does not support the video tag.