My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/01 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 11:26:32 AM
Creation date
5/1/2024 6:21:51 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 2 Scope of Services <br />Objective <br />The Lexington-Broadway Stormwater Improvements Phase 1 (Project) contract objectives are to <br />provide the following services to the City of Everett (City): <br />1. Provide Phase 1 design services. <br />2. Prepare land use and environmental permit applications in support of Phase 1 work. <br />3. Prepare land use and environmental permitting services in support of the future Phase 2 <br />final design. <br />General Assumptions <br />The project will be conducted according to the following assumptions: <br />1. The project duration will be 12 months following receipt of Notice to Proceed (NTP). <br />2. The City will provide utility notices and coordination for service connections and for <br />relocations. <br />3. The preliminary design concept plan, data, and information may be used without significant <br />revisions. <br />4. Deliverables will be provided in electronic format and delivered via email and/or SharePoint <br />(cloud-based server) unless otherwise noted in tasks/subtasks. <br />5. Workshops and meetings will be conducted via the Microsoft Teams virtual platform, unless <br />specifically noted otherwise in the task/subtask assumptions. <br />6. Travel time, travel expenses (mileage and meals), and printing costs will be reimbursed and <br />are covered under the respective task/subtask for that work. <br />Scope of Services <br />Task 100 Project Management <br />Objective <br />The objective of this task is to monitor, control, and adjust scope, schedule, and budget and to <br />provide monthly status reporting, accounting, and invoicing. <br />Consultant Services <br />HDR Engineering, Inc. (Consultant) will provide the following services. <br />1. Conduct project initiation, record keeping, and project closeout activities. <br />2. Prepare the following upon receipt of a Notice to Proceed (NTP): <br />A. Project Management Plan (PMP) outlining the project scope, team organization, <br />schedule, staffing plan, communications information, and Quality Management Plan <br />(QMP)
The URL can be used to link to this page
Your browser does not support the video tag.