Laserfiche WebLink
<br />Lexington-Broadway Stormwater Imp. Phase 1 19 Scope of Services <br />following receipt of the 90 percent design review. Technical review meetings will require 1 <br />hour each for preparation and follow-up for each Consultant attendee. <br />Deliverables <br />The following deliverables will be produced: <br />1. Agenda and meeting notes (Word or PDF). <br />Subtask 720 Final Design Services <br />Consultant Services <br />The Consultant will provide the following services: <br />1. Stormwater system design including the following: <br />A. Prepare a Construction Stormwater Pollution Prevention Plan (CSWPPP) based on <br />SWMMWW guidelines. <br />2. Prepare draft final and final design drawings and contract documents that include the <br />following: <br />A. General, demolition, civil, storm, and water. <br />B. Electrical power service and site lighting. <br />C. Structural design. <br />D. Traffic signing and striping (replacement and restoration) and temporary traffic control <br />related specifications. <br />3. Prepare Engineer’s OPCC (AACE Class 1) based on the itemized bidders list. <br />City Responsibilities <br />The City is responsible for the following activities: <br />1. Provide reviews with one set of consolidated (conflict-resolved) comments on the draft final <br />milestone submittal package and CSWPPP within 15 business days of receiving draft <br />submittal documents. <br />2. Provide current City of Everett GSP template, contract inserts, and non-technical <br />appendices (wage rates) inserts. <br />3. The City will complete and manage the advertising, bidding, and procurement process. <br />Assumptions <br />The following was assumed for this task: <br />1. The conveyance and water quality treatment facility hydrologic modeling prepared with the <br />Lexington-Broadway Stormwater Improvements preliminary design may be used without <br />significant revisions.