My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 5/1/2024 Amendment 1
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction 5/1/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 9:31:01 AM
Creation date
5/2/2024 9:30:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
5/1/2024
Council Approval Date
5/10/2023
End Date
12/30/2024
Department
Transportation Services
Department Project Manager
Sabina Araya
Subject / Project Title
Inductive Charging Infrastructure for Eclipse Mill Park
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003790
Total Compensation
$103,534.59
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 6/12/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />An Employee-Owned Company <br /> <br />499 NE Midway Blvd, Suite 2 Oak Harbor, WA 98277 P: 360-679-3000 F: 360-679-2589 <br />• Weekend or Premium Time Work <br />• Hazardous material abatement <br />• Sales Tax <br />• 3” concrete pad under socket, this detail was removed/changed by Elcon. <br /> <br />Valdez Construction is pleased to provide a cost to relocate and install the system in the street per the <br />revised drawing provided by Elcon Engineering. <br /> <br />Everett Transit cost to do this work will be in addition to base contract $94,208.00 + WSST. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Peter Uzunov <br />Valdez Construction <br /> <br />Proposal is valid for 30 days from date of receipt. <br />Please direct all questions regarding this proposal to Peter Uzunov at 360-679-3000 or 360-824-1029 <br />puzunov@valdezco.com
The URL can be used to link to this page
Your browser does not support the video tag.